SMU Potentiostats and EC-UPGRADE Kit Quick Start Guide
071347302 / March 2020
9
Prepare the analyte and assemble the test cell
Before connecting to the DUT, make sure to prepare the analyte and assemble the test cell for your test.
Connect to the DUT
The next figure shows the connections from a SMU to a three-electrode test cell.
Figure 11: Front panel connections
Run a test
Once you have configured your SMU and connected a test cell, you are ready to run a test. For this example,
you will run the Cyclic Voltammetry test.
To run a test:
1. Press the
HOME
key.
2. Select the active script indicator at the top of your home screen. If there is no script activity, the indicator
displays "No Script."
Figure 12: Active script indicator