VOT 2; Rev 1.2; EN; 09.07.2013
TKT67C
– Installation and maintenance
31
In circuit monitoring, the central battery unit will wait for a few minutes and let the luminaires warm up
before measuring the current in each circuit. The first luminaire test is automatically a configuration. The
configuration cannot be interrupted. The results of later tests are compared with the configuration data.
Once the
Luminaire test
and
External fault
LEDs go off, the central battery unit is configured and has
returned to normal mode. In normal mode, the display will show the information of each circuit one at a
time. The information of each circuit will be shown for four seconds.
You can browse the circuit information with the
BROWSE
button.
After the central battery unit has configured itself, it will return to the
normal mode
.
6. Maintenance
The condition of the emergency lighting system must be ensured by regular maintenance according to
the laws and regulations of local authorities.
In addition to the checks and inspections there is no regular maintenance required for the central
battery unit, other than changing the batteries when the specified emergency mode duration is no
longer achieved.
The luminaires need to have their light sources replaced once they have reached the end of their
lifetime.
Only a qualified electrician may perform such maintenance operations which require opening of
the casing of the central battery unit or the battery container.
6.1 Replacing the batteries
To replace the batteries,
1. Open the CBU door.
2. Switch off the battery fuse (see picture from chapter
Mains operation
and
Internal fault
LEDs will be lit.
3. Turn the S1 main switch and distribution fuse to '0' position (see picture from chapter
).
The display LEDs go off = the central battery unit is de-energized.
4. Remove the cover from the battery case(s).
5. Disconnect the cables coming from the central battery unit from the batteries.
Remove the minus cable first.
6. Remove the battery interconnection cables.
7. Pull the temperature sensor aside.
8. Lift off the batteries and replace them with new ones.
9. Place the batteries' temperature sensor between the batteries.
10. Connect the battery cables (pay attention to polarity and insulation distances).
11. Close the battery case cover(s).
Содержание TKT6716C
Страница 26: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 26 5 2 1 Parts layout...
Страница 42: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 42...
Страница 43: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 43...
Страница 44: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 44...
Страница 45: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 45...
Страница 46: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 46...
Страница 47: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 47...
Страница 48: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 48...
Страница 49: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 49...
Страница 50: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 50...
Страница 51: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 51...
Страница 52: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 52...
Страница 53: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 53...
Страница 55: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 55...