VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
6
3.5 List of optional features
For more information on optional features, see chapter
TST6631
Integrated printer for TKT66xxC
TST6632
LCD display module for TKT66xxC
TST6622
LON Interface for TKT66xxC
TST6601
BACnet Interface for TKT66xxC
TST6621
ACM Interface for TKT66xxC
TST6624
Web server for TKT66xxC
TST1811D BCM Interface for TKT66xxC
XWT6671 TKT66C switched-maintained package 5-8 MODE links for TK6608C
XWT6672 TKT66C switched-maintained package 13-16 MODE links for TK6616C
XWT6673 TKT66C switched-maintained package 21-24 MODE links for TK6624C
TST6651
Addressable IC package for TKT6608C
TST6652
Addressable IC package for TKT6616C
TST6653
Addressable IC package for TKT6624C
3.6 General description
TKT66xx(N)Cxx central battery unit is designed and manufactured according to the standards EN
50171 and EN 60439-1.
In normal situation, the central battery unit operates using a 230 VAC mains voltage, maintaining the
battery charge level and supplying a voltage of 230 VAC to the maintained output circuits. If the mains
voltage is interrupted or it drops below 180 V, the central battery unit switches to battery use. This
connects a voltage of 220 VDC to the non-maintained circuits and the voltage supply to the maintained
circuit switches from 230 VAC to 220 VDC. The battery supply is used as long as the mains voltage
remains unavailable or the battery voltage has dropped to the deep discharge limit (173 V).
In addition to the above mentioned standard functions, the control unit of the central battery unit also
includes the following monitoring, testing and reporting functions:
testing the luminaires either through addressable monitoring or by measuring the circuit
current and by monitoring the condition of the batteries
testing the capacity of the battery
indicating the address of the faulty luminaire with the LED and the number of the circuit,
in the addressable monitoring of the luminaires (7 segment display and LED bar)
indicating the faulty luminaire circuit with the LEDs and the number of the circuit in the
circuit monitoring (7 segment display)
a short operation test time can be
set to take place after each 1…7 days
battery test every 6 mon
ths 4.1 and 4.7 at 0.00 o’ clock.
tests can also be started manually
reporting of the test results on a printer, in the TKT66xxCD(L) models or optional
integrated printer TST6631 (= log book)
LCD display (optional)
in the report, the test date, possible faulty luminaires, duration of the test and the
condition of the battery can be seen
interface options for central monitoring
Содержание TKT66
Страница 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Страница 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Страница 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Страница 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Страница 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Страница 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Страница 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Страница 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Страница 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Страница 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Страница 52: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 52 APPENDIX 5 Circuit diagram with 3 phase input...
Страница 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Страница 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Страница 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Страница 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Страница 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Страница 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Страница 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Страница 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Страница 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...