![Teknion Interpret Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/teknion/interpret/interpret_installation-manuals_1076872016.webp)
Section:
Description:
Page No:
Date:
ASSEMBLY TRAVERSE BEAMS AND CLAMPS
DETAIL
Feb 2017
15 of 17
INT_002a
STEP 20: Line up Worksurface pilot holes with Clamp Bracket middle hole. Make sure to use
proper holes depending on the Gable connection. Use 3-1/2" machine screw to connect
Worksurface to the Clamp Bracket and Pan Washer screws to fasten it to Cantilevers.
Pilot hole to
be used for End
Gable Connection
Pilot hole to
be used in Middle
Gable Connection
UNDERSIDE VIEW
Worksurfaces shown
installed on WWSDB)
AI AJ
STEP 19: Use Space Blocks and Hex Nuts to attach Central Rail to Frames. Central Rail Cap is
installed when Screens/Storage installation is not specified. Otherwise please save it for the
future installation.
AE1
AK3
AK3
AK1
BH3
Power Cut Out
Worksurface (WWWRP)
with Power Access Door
Installed (see INT_404)
NOTE: Install Peninsula Support
Kit and Peninsula Worksurface
first if specified. Refer to
Installation Guide No. INT_006a
and INT_006b for Information.
interpret
AE2