![Teknion Interpret Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/teknion/interpret/interpret_installation-manuals_1076872015.webp)
Section:
Description:
Page No:
Date:
ASSEMBLE CENTRAIL RAIL
DROP RAILS ON THE TOP OF FRAMES
INT_002a
15 of 17
INT_002a
BC2
AK2
AF
CE
BH2
CJ2
CD2
BC2
AE2
AK2, BH2, CJ2
AE2, BC2, CD2
Set Screws
SIDE VIEW
STEP 17: Slide Hex Head Bolts into channels located underside of Rails. Install End Caps on 2
Beginning and End Central Rails. Secure in place turning End Caps Set Screws.
AE2
CD2
End Cap
End Cap
STEP 18: Raise each Central Rail assembly over Frames. Slide Screws inside the rail to line
them up with the holes in Cantilevers, Clamps and Spacer Blocks. Drop Central Rails on the
top of Frames. NOTE: Start from the Middle one for easier alignment.
interpret