![Teknion District Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/teknion/district/district_installation-manual_1076849006.webp)
STEP 1: Insert Locking Bolt into "L" Brackets. Line up holes of "L" Brackets with applicable
holes on Mounting Bracket. Use guide on page 2 to determine correct position.
STEP 2: Fasten with machine screws included with Bracket Kit.
STEP 4: Fasten Electrical Box to the Bracket with Machine Screws included. Make sure the
arrows located on the Box are pointing up.
STEP 3: Drop Power Box on the top of Mounting Bracket making sure you line-up correct
holes using guide from page 2.
B3
A
B3
B2
C1
WARNING! *Do not connect to power source until installation is complete. *Connection to the building power source must be performed by a licensed electrician. *Not following these instruction
could result in damage and/or injury. *It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations.
Section:
Description:
Page No:
Date:
"L" MOUNTING BRACKETS INSTALLATION
SECURING IN PLACE
POWER BOX AND BRACKET ASSEMBLY
FASTENING BOX TO BRACKET
DIS_901a
6 of 11
Dec 2015
district