Teknion District Скачать руководство пользователя страница 10

STEP 5: Insert Locking Bolts and install Power Box assembly under horizontal tube, securing

in place by Lock Nuts. To choose right location, measure 5.3" from vertical tube to edge of
Electrical Box, or 4.5" from plastic cage as shown on the Detail.

The distance between face of Panel Wall vertical tube has to be 5.3" for both Single and Double
Power Box, for both left hand and right hand location.

C2

5.3"

4.5"

WARNING! *Do not connect to power source until installation is complete. *Connection to the building power source must be performed by a licensed electrician.*Not following these instruction

could result in damage and/or injury. *It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations.

Section:
Description:

Page No:

Date: 

INSTALLING UNDER HORIZONTAL TUBE

DETAIL 2

DIS_901a

10 of 11

Dec 2015

district

Содержание District

Страница 1: ... x1 B2 Mounting Bracket MPA25 E079L R x 1pair B3 Machine Screw FS8 32x0 75QR2 x 4 E Receptacle Ordered separately UNQRO x2 Single Sided x4 Double Sided UNQP Bracket Kit x1 C1 Hex Flange Locking Bolt FN5 16 18x2HB x2 C2 Lock Nut FN5 16 18HB x2 D Power Data Bezel Double PB02 E095 x1 Single Sided x2 Double Sided OR Power Data Bezel Single PB02 E096 x1 Single Sided x2 Double Sided B1 B3 E C1 B2 C2 A B...

Страница 2: ...l installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date DOUBLE BOX ALL PANEL WALL WIDTHS ...

Страница 3: ...power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 24 WIDE PANEL WALL Dec 2015 3 of 11 DIS_901a district ...

Страница 4: ...rce must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 30 36 WIDE PANEL WALL Dec 2015 4 of 11 DIS_901a district ...

Страница 5: ...nnection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations Section Description Page No Date SINGLE BOX 39 96 WIDE PANEL WALLS Dec 2015 5 of 11 DIS_901a di...

Страница 6: ...e you line up correct holes using guide from page 2 B3 A B3 B2 C1 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accord...

Страница 7: ... to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes and regulations NOTE If over Horizontal Tube configuration is...

Страница 8: ...nstructions see DIS_201 202 and Bazel s E C3 D WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicabl...

Страница 9: ...as per guide on page 2 B2 C1 B3 A B3 B1 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable codes...

Страница 10: ...Box for both left hand and right hand location C2 5 3 4 5 WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance wit...

Страница 11: ...instructions see DIS_201 202 and Bezel E C3 D WARNING Do not connect to power source until installation is complete Connection to the building power source must be performed by a licensed electrician Not following these instruction could result in damage and or injury It is recommended that electrical connections be made under the supervision of a licensed electrician in accordance with applicable...

Отзывы: