background image

 

 

GEMINI 5540A 

 

Page 3 of 4 

5540A-901,Rev. A 

NOTE:

 

The GEMINI RF Power Meter may be calibrated to either the input 

or output port. However, the RF power source must always be connected 

to the input port regardless of which port is calibrated. Failure to do so 

may result in incorrect readings. Refer to the Calibration Certificate for 

port calibration information. 

 

Connect  the  USB Type B cable  to the GEMINI RF Power 

Meter  5 VDC power and data transfer port. Connect the 

other end of the USB Type B cable to a suitable 5 VDC, 500 

mA power source. The GEMINI RF Power Meter display will 

illuminate.  

NOTE:

 

The GEMINI RF Power Meter may be connected to any USB power 

source capable of supplying 5 VDC, 500 mA. This includes some mobile 

device  portable power banks  and  wall chargers. However,  for 

communication and data collection, connection to a USB 2.0 or higher 

port on a computer or other data collection device is required.

 

 

Connect the GEMINI RF Power Meter OUTPUT to a suitable 

load using torque techniques appropriate for the connector 

type. 

WARNING:

 High RF power levels may be present at the output 

of the GEMINI RF Power Meter. 

Always connect an appropriate load 

to the instrument output. 

 

WARNING:

 The GEMINI RF Power Meter should be serviced by 

qualified personal only. 

Never attempt to open the instrument casing, 

disconnect transmission lines, or otherwise service the meter while RF 

power is applied to the system.

 

Failure to comply with these warnings  may result in injury or 

death to personnel, and damage to equipment. 

 

Connect the GEMINI RF Power Meter INPUT to the RF power 

source using torque techniques appropriate for the 

connector type. 

 

Allow 10 minutes for the instrument to warm up.   

Отзывы: