PRE-OPERATION
Please read before turning on the item
Please completely remove this unit from all packaging materials. Be aware that it may contain packaging internally
to stop the movement of shelves or baskets.
Run the equipment for at least 2 hours prior to loading with any product
Always place product into refrigeration equipment in small batches. If you attempt to fill the fridge/freezer
completely with un-chilled product it may place undue stress on therefrigeration system.
Always neatly place items into the equipment ensuring for adequate air circulation.
Always place items gently into the equipment, never throw items as this may damage the insulated wall
panels.
Energy Saving
To save energy and improve the efficiency of your equipment please do not open the door any more than is
required. When the door is open please ensure that this time is kept to a minimum.
If you can hear the refrigeration system is running please take extra care not to keep the door open any longer
than is necessary as this may place extra stress on the refrigeration system.
Never transport this unit any way
except in its standard upright
position.
Never tilt the product to an angle
of more than 45 degrees from
horizontal. Always leave the
product to rest for at least 1 hour
after transportation.
For maximum performance this
item should beplaced in a well
ventilated area away from direct
sunlight, sources of heat and
forced air.
Always place the item on a strong
and level floor to eliminate noise
andvibrations
Before using this item please use
warm water and a mild detergent
to wipe down all internal and
external surfaces
- this will remove anytraces of
debris that may be left form the
manufacturing process.
Transportation
Positioning
Cleaning
Содержание ATOM MAXI MK2
Страница 1: ...ATOM MAXI MK2 FREEZER...
Страница 8: ......