 TRBH SYSTEM PRESENTATION 

 

The 

TRBH

 

SYSTEM

,  installed  on  the  resin  transformers,  will  allow  thermoregulation  of  the  single  phase  U-V-W  of  the 

transformer.  Activation  of  the  ventilation  system  and  the  regulation  of  the  air  flow  of  the  fans  will  be  managed  by  the 
thermometric control unit models: NT935BH-D and NT935BH-ETH.  
 
 
The activation and shutdown of the ventilation system, programmable on the thermometric devices, they will be anticipated 
by  10°  C  with  respect  to  the  FAN1  ON  threshold  (programmed  on  CH1-CH2-CH3):  ON  speed  S1  and  OFF  speed  S0, 
maximum speed S10 will reach at the threshold value of FAN1 ON. 
 
E.g. threshold programming FAN1 ON 70°C  
 

 

Activation of ventilation system TRBH ON 61°C, speed (rpm) fan S1. 

 

Switch off ventilation system TRBH ON 60°C, speed (rpm) fan S0 

 
 
The speed regulation (rpm) on the fans is divided into 10 steps in relation to the temperature detected on the CHF channel 
and to the FAN 1 ON value.  
 
E.g. programming of the threshold FAN1 ON 70°C, the fan speed will progressively increase in relation to the temperature 
detected on the individual channel, see table example speed CH1.   
 

 

table example speed CH1 

 

Temperature CH1 

 

Motor S and Rpm Speed 

Fan flow rate

 mᶟ/h

 

TG180BH 

TG360BH 

TG500BH 

60°C 

S0 = OFF 

OFF 

OFF 

OFF 

61°C 

S1 = 1500 

220 

430 

507 

62°C 

S2 = 1650 

245 

455 

567 

63°C 

S3 = 1780 

265 

535 

617 

64°C 

S4 = 1925 

295 

580 

650 

65°C 

S5 = 2075 

335 

630 

710 

66°C 

S6 = 2220 

370 

700 

775 

67°C 

S7 = 2365 

390 

750 

850 

68°C 

S8 = 2500 

410 

795 

890 

69°C 

S9 = 2650 

430 

850 

960 

70°C 

S10/full Speed = 2800 rpm 

450 

880 

1000 

 
NOTE:  The  speed  regulation  on  the  installed  fans,  with  reference  CH2  and  CH3,  will  be  managed  in  relation  to  the 
temperature increase on the relative channel (selections B2-M3 and B1-M3).  
 
 
The TRBH system will introduce the following advantages into your system:   
 

 

Containment of thermal and mechanical shock 

 

Stress reduction of the ventilation system  

 

Reduction in ventilation system consumption 

 

Reduction of noise emitted by the fans on average 

 

Motor fault identification and signalling  

 

Fan speed regulation  

 

Custom configuration of the ventilation system  

 

Fan protection for ambient overheating 

 
 
In  relation  to  the  number  of  fans  installed, the TRBH system  provides for  the  possibility  of  programming  the  number  of 
connected bars (B1 - B2) and the number of fans on the single bar using the thermometric control unit.  

Содержание TRBH

Страница 1: ...O9001 certified quality system http www tecsystem it R 1 1 29 07 20 Translations of the original instructions INSTRUCTION MANUAL TRBH SYSTEM TECSYSTEM S r l 20094 Corsico MI Tel 39 024581861 Fax 39 02...

Страница 2: ...NTROL BOX B1 CONTROL BOX B2 ELECTRICAL CONNECTIONS FANS CONTROL BOX ELECTRICAL CONNECTIONS 15 CONNECTION NOTES 20 11 FANS TEST 12 FAN DIAGNOSTICS 21 13 TG180BH TG360BH TG500BH FANS DIMENSIONS 14 1200B...

Страница 3: ...or smoke contact the assistance LIQUIDS Do not expose the equipment to splashes or drops do not position it in places with humidity exceeding 90 and never touch with wet hands If any liquid penetrates...

Страница 4: ...vice if there is a smell of burning or smoke Contact the Tecsystem technical assistance LIQUIDS Do not expose the product to dripping or splashing liquids Do not place in places with humidity over 90...

Страница 5: ...outputs for motors B1 M1 M2 M3 and B2 M4 M5 M6 230Vac 50 60Hz Range 187 265Vac 50 60Hz 1 digital output for control box B1 B2 BLDC OUT 12VDC DIMENSIONS 106x108 depth 53 50mm Din rail TESTS AND PERFOR...

Страница 6: ...att INPUTS Digital input for the control box connection TESTS AND PERFORMANCE Ambient operating temperature from as indicated in the standard IEC 60076 11 IP40 degree of protection Min and max speed r...

Страница 7: ...on the individual channel see table example speed CH1 table example speed CH1 Temperature CH1 Motor S and Rpm Speed Fan flow rate m h TG180BH TG360BH TG500BH 60 C S0 OFF OFF OFF OFF 61 C S1 1500 220...

Страница 8: ...8 TRBH SYSTEM SYSTEM COMPONENTS Temperature control unit versions NT935BH D NT935BH ETH Control box CB3 BH B1 management bar 1 M1 M2 M3 B2 management bar 2 M4 M5 M6 Fans TG180BH TG360BH TG500BH BH bar...

Страница 9: ...3 poles pitch 5 supply Code 2PL0367 Screws tightening torque 0 5Nm 2 Terminals 3 poles pitch 3 81 control box IN OUT Code 2PL0366 Screws tightening torque 0 25Nm 1 Terminal 12 poles pitch 3 81 motor...

Страница 10: ...olley and centre the positioning of the bar using the central column of the transformer as a reference Fix the bar on the transformer trolley using the appropriate fixing slots suggested M8 bolts plus...

Страница 11: ...lock the fans in the desired position Use the fan flappers to correctly direct the air inside the transformer columns ATTENTION always maintain a safe distance from the windings indicated by the tran...

Страница 12: ...movement avoid deforming the impeller fins Never change the position of the motor If the fan bar is mounted on a transformer the fan s working position must respect the safety distance indicated in t...

Страница 13: ...L BOX BAR B1 and CONTROL BOX BAR B2 using the supplied labels The identification of the two bars will be used to define the connections of the two boxes and of the fans M1 M2 M3 M4 M5 M6 associated wi...

Страница 14: ...ow Power supply for 230Vac 50 60Hz motors it is used to power the B1 M1 M2 M3 box fans or the B2 M4 M5 M6 box fans The earthing cable must always be connected to the earthing terminal ELECTRICAL CONTR...

Страница 15: ...colour 1MN0181 REV 0 A B Connector A motor power supply pin 1 neutral blue pin 2 phase brown pin 3 nc Connector B digital signals for motor signals pin 1 white pin 2 brown pin 3 blue pin 4 black The c...

Страница 16: ...gle fan with the relative digital cable motor signals to the MOTORS CONTROL LINE output of the control box B1 bar digital connection B2 bar digital connection M1 M2 M3 1 White 2 Brown 3 Blue 4 Black 5...

Страница 17: ...0Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 3 In the B2 M1 configuration 2 bars B1 B2 2 connected fans M1 M6 the positioning and connection of the fans must absolutely r...

Страница 18: ...the fans result in anomalies in operation of the TRBH system Connect the motor connector A of the single fan with the relative motor power cable to the MOTORS POWER LINE output of the control box B1...

Страница 19: ...ions of the individual fans connect the 230Vac 50 60Hz fan lines to the MOTORS POWER SUPPLY input of both control boxes B1 B2 M1 M2 Brown Blue Brown Blue Connect the B motor connector of the single fa...

Страница 20: ...ton of the single control box it is possible to start the fan test During the fan test the control box will activate in sequence for approximately 10 seconds on a fan the M1 M2 M3 fans connected to th...

Страница 21: ...or the single motor Fan speed M1 M6 M2 M5 M3 M4 motor over temperature motor temperature over 70 C general motor failure motor blocked or under stress impeller disconnected from the motor shaft motor...

Страница 22: ...22 TRBH SYSTEM TG360BH TG500BH BH BAR DIMENSIONS 1200BH 1MN0167 REV 0 1MN0168 REV 0 1MN0171 REV 0...

Страница 23: ...nly when the product is damaged by causes attributable to TECSYSTEM srl such as manufacturing or components defects The warranty is invalid if the Product proves to have been tampered with modified or...

Страница 24: ...the bars B1 and B2 Clean the fans using only compressed air Contact the TECSYSTEM Technical Department if the problem persists The European Directive 2012 19 EU WEEE has been approved to reduce electr...

Отзывы: