Version No.: V1.0 

 
 
 
 
 

MV510

 

series Medium-Voltage Inverter 

 
 
 

 

Maintenance manual 

 
 
 
 
 
 
 
 
 
 
 
 

Taian Technology (Wuxi) Co., Ltd. 

(TECO Group) 

 

 
 
 
 

Содержание MV510 Series

Страница 1: ...Version No V1 0 MV510 series Medium Voltage Inverter Maintenance manual Taian Technology Wuxi Co Ltd TECO Group...

Страница 2: ...ng use of the medium voltage equipment with medium voltage AC power inside that may lead to personal injury 1 3 Please abide by instructions for various models during transportation or operation Other...

Страница 3: ...his VFD forward or backward by over 10 degrees during installation Otherwise the VFD may slide down and lead to injury 1 7 Keep balance under instruction of the work supervisor during transportation w...

Страница 4: ...be overloaded and damaged if the wrong parameters are set 1 11 Only the qualified and trained personnel with proper safety measures are allowed to operate this VFD Electric shock injury or fault may...

Страница 5: ...se of fire please turn the circuit breaker of medium voltage power and control power to the OFF position immediately and do not attempt to use the VFD Otherwise fire may be caused 1 15 Do not block th...

Страница 6: ...njury may be caused 1 17 Do not stop air conditioner in the VFD room during operation Otherwise the room temperature may raise and lead to failure of the drive 1 18 Turn the circuit breaker of medium...

Страница 7: ...ion injury or failure 1 21 Please contact us timely in case of faults of operation We will provide remote assistance or assign maintenance engineers to your site for solving the problem 1 22 Please us...

Страница 8: ...startup cabinet which is a direct power on solution Due to the different capacity of the inverter the cabinet size will change accordingly Please refer to the random size for detailed dimensions Equi...

Страница 9: ...nment with excessive vibration or shock Environment with dust metal dust salt sulfuric acid and chlorine Storage in a poor environment Daily inspection The daily inspection of our medium voltage inver...

Страница 10: ...ium voltage inverter cut off the main power and control power of the medium voltage inverter UPS power off 2 Wait for more than 15 minutes confirm the implementation of item 1 and confirm the discharg...

Страница 11: ...e dirt garbage and dust attached Wire Is the wire cladding damaged or aged Transformer Is the coil part and insulation paper damaged Is there any dust or foreign matter on the coil part Power cell Doe...

Страница 12: ...resistance measurement on the primary side of the inverter Please use a 2500V megohmmeter The acceptance criteria are 1000 M or more Since the grounding is performed with a high resistance detected b...

Страница 13: ...nual 12 Step1 VFD Input terminal Step1 Voltage detection board Step3 Test point Figure 2 3 1 Insulation resistance measurement on the secondary side motor side of the inverter Please use a 2500V megoh...

Страница 14: ...onnect the ground wire of the output voltage detection board Step 7 Stay away from the test points Step 8 Connect the positive pole of the megohmmeter to VFD output U phase terminal and the negative p...

Страница 15: ...lines of the temperature controller Step 13 Disconnect the lightning arrester R phase at the input end of the transformer Step 14 Stay away from the test points Step 15 Connect the positive pole of t...

Страница 16: ...MV510 series high voltage inverter maintenance manual 15 Step11 Voltage detection board Step12 Temperature controller Step12 PT100...

Страница 17: ...g regular inspections be sure to tighten the screws and bolts again Tightening torque M5 bolts 2 5 to 3 5 N m M6 bolts 4 4 to 6 6 N m M8 bolts 8 9 to 10 8 N m M10 bolts 18 to 23 N m M12 bolts 31 5 to...

Страница 18: ...kage from the smoothing capacitor Check for loose bolts in the input terminals R S T and the output terminals T1 T2 Retighten bolts to the recommended tightening torque Check for a loose fiber optic c...

Страница 19: ...replace the parts according to the durability of the consumables The approximate standard for periodic inspection varies depending on the setting environment and usage of the inverter Please refer to...

Страница 20: ...fan Run time 40000 hours Electrolytic capacitor 5 years A printed circuit board 8 years Fuse 10 years Note This manual is applicable to the MV510 series high voltage inverter produced by Taian Technol...