EVO STAR
Uninterruptible
Power
Supply
EVO STAR 60 – 800 KVA
Installation and User Manual
Страница 1: ...EVO STAR Uninterruptible Power Supply EVO STAR 60 800 KVA Installation and User Manual...
Страница 2: ...____________________________ EVO STAR 60 800 1 Copyright 2007 TECNOWARE s r l All rights reserved All trademark are property of their respective owners TECNOWARE s r l www service tecnoware com This m...
Страница 3: ...R UP TO 150 KVA 17 POWER OVER 150 KVA 17 4 CONNECTING THE U P S TO THE MAINS SUPPLY 18 4 1 COMPATIBILITY WITH THE POWER SUPPLY 18 4 2 INDIRECT POWER SUPPLY 18 4 2 1 TRANSFORMER 18 4 2 2 GENERATOR 18 4...
Страница 4: ...7 1 2 3 BATTERY TEST 31 7 1 3 FUNCTIONING MODE CONFIGURATION 32 7 1 3 1 BATTERY CHARGE MODE 32 7 1 3 2 FORCING ON INVERTER MODE 32 7 1 4 SYSTEM AUTONOMY 32 7 1 5 BUZZER 32 7 1 6 STRUCTURE MENU 33 33...
Страница 5: ...48 13 1 SNMP 48 13 2 ISTALLATION 48 14 OUTPUT FREQUENCY 48 15 BATTERIES 49 15 1 EXTERNAL BATTERY CABINETS 50 15 1 1 DESCRIPTION OF THE MAX 32 BATTERIES CABINET UP TO 44Ah 51 15 1 2 DESCRIPTION OF THE...
Страница 6: ...complete information on installation operating and preventative maintenance of the UPS and Battery Cabinet Illustrations showing the function of all operator controls instruments alarms and indicatin...
Страница 7: ...bber gloves when working on damaged batteries Never remove the doors and protection covers while the equipment is operative When working on the UPS you must remove any metallic objects you may be wear...
Страница 8: ...the source of contact Call immediately for an ambulance and if necessary for the help of a technician specialised in electrical equipment PEOPLE WHO HAVE COME INTO CONTACT WITH CORROSIVE LIQUIDS Ask i...
Страница 9: ...Specifies the serial number of the product 7 Specifies weight In the picture you can see the identity sticker placed on the packaging of the battery 1 Specifies the battery cabinet model 2 Specifies t...
Страница 10: ...kaged It must not be exposed to the inclemency of the weather and the room shouldn t be too humid humidity below 90 non condensing nor should the UPS be exposed to sources of heat room temperature sho...
Страница 11: ...ordinary maintenance When choosing the rooms please remember that the equipment must not be exposed to the inclemency of the weather to corrosive substances to excessive humidity humidity below 90 non...
Страница 12: ...is a continuous controlled voltage available to charge or maintain battery efficiency cross fuse 6 b and battery switch 8 and to the inverter input 10 This step is to generate a three phase voltage st...
Страница 13: ...ilter give us a very stable three phase voltage with a harmonic distortion lower than one unit The controlling logic of the inverter also controls output current intensity limiting it to a value which...
Страница 14: ...th the internal circuits with a minimum risk of contact with voltaged elements 3 1 5 PART LAYOUT It is important to be familiar with the parts that are necessary during the connection procedures befor...
Страница 15: ...________________________________________________________________________________ EVO STAR 60 800 14 U P S from 120 to 150 KVA FF F F F F F F A B C D E F Picture 3 5...
Страница 16: ..._____________________ EVO STAR 60 800 15 Battery connection Mains switch Reserve switch Output switch Battery fuses Battery switch Spare fuses Neutral bar Rectifier fuses Relay board RS 232 By pass sw...
Страница 17: ...power is not within the set parameters The type of fuse which is used guarantee quick intervention and therefore are a guarantee also for optimum protection of the internal devices Furthermore there i...
Страница 18: ...source back up supply generator U V W Main input U1 V1 W1 N1 Reserve input U2 V2 W2 N2 Output D C Battery pole input D negative pole C positive pole In 100KVA device terminal D and C are double in 120...
Страница 19: ...load which generates harmonic frequency currents multiples of the 50 60 Hz In function of the line impedance these create a harmonic voltage distortion This latter value total harmonic voltage distort...
Страница 20: ...he supporting feet 2 Shutdown all breakers 3 Verify the integrity of the by pass breaker lock out 4 Make sure there is no voltage on the mains supply 5 Unscrew the second access panel setscrews and re...
Страница 21: ...______________________________________ EVO STAR 60 800 20 4 5 1 CONNECTION WITHOUT BACK UP LINE INPUT LINE L1 L2 L3 LN U V W Mains switch By pass switch Output switch N1 C D U2 V2 W2 N2 USER L1 L2 L3...
Страница 22: ..._ EVO STAR 60 800 21 4 5 2 CONNECTION WITH BACK UP LINE Picture 4 4 MAINS LINE L1 L2 L3 U V W Mains switch By pass switch Output switch N1 C D U2 V2 W2 N2 USER L1 L2 L3 LN Battery switch Battery box L...
Страница 23: ...ponding battery breaker placed on the U P S is off then shut down the battery switch on the cabinet 11 Using a multimeter verify the correct polarity on the U P S battery terminals 12 Close the second...
Страница 24: ...4 7 1 OPEN FRONT PANEL Open the lock with supplied key In model of power 120KVA 800KVA open door where the control panel is mounted 4 7 3 REMOVE SECONDARY DOOR Open front panel Remove screws on sides...
Страница 25: ...tch on procedure started will appear if the steps of procedure have been followed correctly led C and led E will become green and the message UPS in alarm mode will appear 7 Once you have carried out...
Страница 26: ...hnician to do It is installed on the machine or on the remote control panel Specialised technicians can carry out After sales installation only The switch on board the machine is on the right hand sid...
Страница 27: ...MAL FUNCTIONING FROM THE PREVIOUS CONDITION 1 Turn on the Reserve switch breaker the message UPS Stopped will appear on the display all the synoptic leds will be red except led H remain green wait til...
Страница 28: ...R 60 800 27 RESTORING NORMAL FUNCTIONING FROM THE PREVIOUS CONDITION 1 Make sure the led F is yellow 2 Turn on the Output switch breaker 3 Turn off the Manual by pass breaker 4 Press keys F6 and F2 at...
Страница 29: ...paration of the interfaces remote controlled from the U P S assuring all connected equipment total protection from disturbance and interference 7 1 THE CONTROL PANEL AND ITS FUNCTIONS Panel check func...
Страница 30: ...Output current Inside temperature Load percentage Inverter Phase phase output voltage Link DC voltage Link DC current Frequency Rectifier Input Voltage Link DC voltage Link DC current Battery Voltage...
Страница 31: ...shing Output current over the nominal value green Manual by pass open H By pass red Manual by pass closed Chart 2 7 1 2 2 EVENT AND HISTORY MENUS The EVENT menu allows viewing of all the alarms in pro...
Страница 32: ...ed Error in frequency synchronism Anomaly IV6 Frequency error Frequency error Anomaly IV7 Current 125 Output Current 125 Anomaly IV8 Current 150 Output Current 150 Anomaly IV9 High current Output Curr...
Страница 33: ...iagram 1a b These keys activate the starting procedure which consists of the starting of the rectifier only This makes it possible to charge the batteries through the terminal contacts C and D This fu...
Страница 34: ...________________________________________________________________________________ EVO STAR 60 800 33 7 1 6 STRUCTURE MENU...
Страница 35: ...________________________________________________________________________________ EVO STAR 60 800 34...
Страница 36: ...6 key Relay programming or press F3 key to escape In the secondary menus you can select a relay F7 F8 keys press F6 key to confirm or F3 to escape In relay menu there are all the alarms possible for r...
Страница 37: ...L7 HITEM If air flow is too hot probe turn on and temperature alarm is set Probe turns on at 90 C Temperature alarm will turn off UPS and load supply is transferred to back up line red DL8 DESAT One o...
Страница 38: ...ated A 8V supply voltage Verde DL2 Isolated A 15V supply voltage Verde DL3 Isolated B 8V supply voltage Verde DL4 Isolated B 15V supply voltage Verde 8 5 FUSES BOARD REPLACING THE FUSES CAUTION ALL CO...
Страница 39: ...d and fans The positioning of boards on device is as in picture 8 2 on CN1 enters AC voltage to measure from CN2 comes out a signal proportional to this voltage CN3 supplies voltage to A04 CN4 supplie...
Страница 40: ...you can find them by flat and wire on which they are positioned Position Wire Flat Jumper Description 1 13 FC3 Jp1 Positioned on wire from DClink to battery switch it is used to read Dc current from D...
Страница 41: ...TED STATE STANDARD CONTACT NUMBER AVAILABLE CONTACTS ALARM CONFIGURATION TABLE 1 N C Output current 150 Load on reserve A RECTIFIER STARTED OPTIONAL 2 3 N A Output current 125 Load on inverter 4 N C F...
Страница 42: ...m You can verify the state of the relays with the led s picture 18 which are placed above each relay 8 11 RECTIFIER FILTER This board is a RC filter on DC voltage generated from rectifier 8 12 BATTERY...
Страница 43: ...hermore it is possible to supply it with an E P O switch chapter 4 2 1 This device is composed of two main parts one interface board inside the machine and an actual synoptic which should be installed...
Страница 44: ...an interface board picture 20 present only if requested before purchase Its position varies according to the different models but it is always viewable and accessible by the user If there is a board...
Страница 45: ...pin13 pin2 pin14 pin1 Close the U P S second access by fastening the screws Continue the starting procedure if already operative restore functioning from U P S by pass following the relative instructi...
Страница 46: ...board picture 18 Turn on the Reserve switch disconnecting switch the message UPS Off will appear on the display and all the synoptic leds will turn red except for led H which will be green wait till l...
Страница 47: ...tatic bypass as soon as epo contact is close Load is not supplied EPO is useful in emergency situations for example fire to disconnect load from supply line 11 1 EPO TYPE 11 1 1 EPO ON CONTROL PANEL I...
Страница 48: ...ia world wide web to make a remote monitoring and management Connect U P S in LAN WAN with usually Ethernet connection able as optional interface or RS232 is possible monitoring UPS as any other wire...
Страница 49: ...ltage break down anomalies that took place during working time or in progress it is possible to send e_mails system shut down etc 13 2 ISTALLATION Kit Mini NetAgent It is suggested a extension wire to...
Страница 50: ...e type of battery used and above all on their capacity Battery capacity is expressed in ampere hour from this parameter you can work out system autonomy This expresses the amount of current delivered...
Страница 51: ...ossible to put several batteries in parallel picture 26 The cabinet code indicates the type of cabinet and also the number of batteries housed in it With these last two parameters you can establish to...
Страница 52: ...cess this area you must remove the four fastening screws in the corners of the roof Apart from the materials listed in picture 28 there are also the battery jumpers To connect to the U P S we suggest...
Страница 53: ...acity In the 2nd 3rd and 4th planes there are 8 battery elements and in the 1st and the last one there are 4 battery elements In the 5th plane there is the battery breaker and the protection fuse whil...
Страница 54: ...g 1250 1400 1800 2100 Protection degree IP 21 Cable entrance Front MECHANICAL DATA Code FGCEVOST400TT FGCEVOST500TT FGCEVOST600TT FGCEVOST800TT Size kVA 400 500 600 800 Dimensions mm 2800x800x1800 300...
Страница 55: ...idge IGBT with pwm control Nominal output voltage 380 400 415Vac trifase N PE Transformer Standard Wave type Sinusoidal Output voltage tolerance Static stability 1 Load variation 0 100 0 8 static stab...
Страница 56: ...800 55 Static bypass Configuration Dual input Voltage windows 10 of nominal system voltage adjustable Overload on bypass 125 continuous 200 for 5 minute 1000 for cycle Manual bypass switch Standard S...
Страница 57: ...ltage but it is not possible to work on terminal breakers for example for remove system without disconnecting load External breaker box is a system of three breaker that can turn off mains line for U...
Страница 58: ...lled bridge made with SCR In this configuration input current has a typical wave as in picture B1 This solution has a THD of 30 usually because there are fifth and seventh harmonic The problems for th...
Страница 59: ...is case voltage and frequency on output are dependent of variations of input Ups only supplies battery U P S will be actived only in case of input black out This configuration is recommended only for...
Страница 60: ...TECNOWARE S r l www service tecnoware com...