I.T.S. Ital Trade Services PT 355 Operating Manual
15
5. Welding Parameters for PE pipes & fittings DVS norm version 2207-1
Pressure-Time diagram for butt welding
t1
=
Time requested for the bead formation with the specified wall thickness
t2
=
Time requested for the continual heating
t3
=
Time requested for the change over
t4
=
Time requested for bringing up the pressure
t5
=
time requested for cooling down
P1
=
Pressure during the bead formation and the cooling down, this value is the result of the formula:
Pipe section( cm2 ) x Material thrust coefficient( Kg./cm2 )
____________________________________________________________ = bar
Total machine cylinders section( cm2 )
Material thrust coefficient for
PE
s
63
1,5 Kg./cm2
Material thrust coefficient for
PP
1,0 Kg./cm2
Total
PT 160
cylinders section
4,32 cm2
P2
=
Pressure during the continual heating, this value either for
HDPE
and
PP
is
0,1 Kg./cm2
.
Optical
checking of butt welding result
Содержание I.T.S. PT 355
Страница 1: ...I T S by Tecnodue PT 355 Edition 1208 Operating Manual ...
Страница 28: ...I T S Ital Trade Services PT 355 Operating Manual 28 10 3 Hydraulic plan ...
Страница 29: ...I T S Ital Trade Services PT 355 Operating Manual 29 11 Exploded view and spare parts list ...
Страница 31: ...I T S Ital Trade Services PT 355 Operating Manual 31 ...