EN | Blast chillers | User and maintenance manual
28
1 POSITIONING OF THE BLAST CHILLER/FREEZER
Before unloading/loading and positioning the blast chiller/freezer inside the shop/kitchen, you are kindly request-
ed to read carefully the instruction manual in the different chapters regarding the unloading/loading, dimensions,
weight, evaporating water basin, adjustable feet, electric connections and maintenance procedures of the blast
chiller/freezer subjected in the present manual.
1.1 TRANSPORT
Kg
Kg
NO
SI
Do not superimpose blast chiller packing (allowed only if there is
wooden crate packing option).
We recommend you to transport the blast/chiller always in the upright po-
sition (as mention on the packing). If the blast chiller/freezer with built in
condensing unit was inclined during transportation we suggest you to keep
the product in the suggested upright position for at least 8 hours, before
switching it on. In this way, you will allow the oil to flow in all the compo-
nents, lubricating them again. Afterwards you can proceed with the start.
1.2 UNLOADING / DIMENSIONS/ WEIGHTS
Kg
The unloading/loading procedures should be executed by pallet-jack or by
forklift driven by skilled and authorized staff. We decline any liability for failing
to comply with safety rules currently in force.
Before starting the unloading, positioning and installation procedures of the
blast/chiller freezer inside the shop/kitchen according to the model of the
blast chiller/freezer, please read carefully the information showed in the di-
mensions and weights list (“APPENDICE - 2” Pag. 136).
The manufacturer declines any responsibilities due to operations performed without adopting the abo-
ve safety precautions.
For further information, refer to the previous chapter “DESCRIPTION OF THE BLAST CHILLER”.
1.3 PACKING
At the delivery please check that the packing is intact and that during transportation no damage was occurred.
Remove the external carton-box; remove the fastener that keeps still the blast chiller/freezer to its pallet, put it
in the correct position and then remove the adhesive white protection of the stainless steel.
The recovery and the recycling of the packing materials such us, plastic, iron, carton box, wood help the sav-
ing of row material and reduce the waste. Please consult your area address book for disposal of materials and
authorized garbage dump.
1.4 CONDENSATE WATER DRAINING/ DRAINING CONNECTION
The blast chiller/freezer is available with a built in condensing unit complete with a removable condensate water
basin with manual defrost (without defrost heater).
The basin is assembled in the lower part, under the condensing unit.