Operation Manual
2.00
22
5.3.3
Mounted on the wall Procedure
Items required:
-
LP_V10/LP_V12/LP_V15
-
TUB_V10 / TUB_V12 / TUB_V15
IMPORTANT Ensure that the surface – wall or ceiling – is strong enough to hold 4 times
V cabinet weight and that the screws 12mm diameter and corresponding plugs required
to fix the “U” bracket on the wall or under the ceiling are properly dimensioned.
Procedure:
1. Remove the two up-side screws from the box.
2. Fill each screw hole with locktite
®
243 (
Not provided)
or equivalent
3. Place the LP_V accessory and secure it with 2 screws.
4. Hold the TUB_V10 / TUB _V12 / TUB _V15 to the wall.
5. Place the unit to the TUB accessory and secure it with the screws.
6. Position the V loudspeaker to desired angle.
Содержание V Series
Страница 2: ......
Страница 26: ...Operation Manual www tecnare com V Series rev 2 00 25 ...