INITIAL HINTS AND TIPS FOR INSTALLING PYRODECK 

COMPOSITE DECKING

All decking must be laid with a fall for drainage. We recommend that you use 1 in 100.

NOTE: WHEN SCREWING THROUGH COMPOSITE PRODUCTS ALWAYS PRE DRILL ANY HOLES

Joists must be laid on a solid flat 

surface such as concrete. Grass, 

uneven paving slabs or sand will 

cause movement.

Always pre drill composite wood 

products using a minimum of 

a 4.5mm drill bit. If you do not 

you risk damaging the product 

over time.

Joists must be set to 350 mm 

centres. If not boards may warp 

or move. Composite boards 

need to be supported across 

their length.

Ends of deck boards must be 

supported and not have an 

overhang of more than 10mm. 

If not boards will move or be 

damaged.

Butted boards must have an 

expansion gap of 5mm between 

boards & be supported by 

separate joists. At edges a gap 

must be left for expansion. If 

not boards may warp or crack 

under pressure.

Содержание PYRODECK CLASS B

Страница 1: ... Always follow the safety precautions when operating a power washer Be sure that water effectively drains from your wood plastic composite decking For those harder to clean areas or where the castellated side of the decking may have been damaged by the dropping of charcoal etc we recommend using a 400 grit sandpaper or above Lightly sand the decking in the same direction of the grain Rinse thoroug...

Страница 2: ...uneven paving slabs or sand will cause movement Always pre drill composite wood products using a minimum of a 4 5mm drill bit If you do not you risk damaging the product over time Joists must be set to 350 mm centres If not boards may warp or move Composite boards need to be supported across their length Ends of deck boards must be supported and not have an overhang of more than 10mm If not boards...

Страница 3: ... your first board into place clipping into the Starter Clips 5 Clip Concealed Fixing Clips into the first board along each of the Joists Pre drill and screw in place See Figure C Space between boards should be 5mm 6 If joining 2 lengths of board together make sure both ends are supported by separate Joists Leave a gap calculated on the expansion rate of 0 3 0 5 of the board length to allow for exp...

Страница 4: ... installer for the installation methods they use and its performance as every installation differs and could be unique Teckwood recommends that all designs should be reviewed by a licensed architect or engineer before installation and that every plan or design meets that building regulations and permission before the beginning installations Please use suitably qualified personnel to prevent injuri...

Отзывы: