7
2-3
Installing the UPS
Rackmount installation
The Rackmount cabinet comes with all of the hardware required for
installation in a standard EIA or JIS seismic Rackmount configuration with square
and round mounting holes. The rail assemblies adjust to mount in 19” racks with
a distance from front to rear around 70~76 cm (27 to 30 inches) deep.
CAUTION
The cabinet is heavy. Removing the cabinet from its carton
requires a minimum of two people.
If installing optional EBP(S), make sure to install the EBP(S)
directly below the UPS so that all wiring between the cabinets is
installed behind the front covers and inaccessible to users.
NOTE
Mounting rails are required for each individual cabinet
(1)To install the rail kit
a)
Assemble the left and right rails to the rear rails as shown in Figure1.Do not
tighten the screws.
Adjust each rail size for the depth of your rack.