Issue/Rev. 0.0 (5/19) ║ MNIN003 • Page 7
Installation
/
Operation
Manual
4728
The functions and locations of these three blocks on the P.C. card are as follows:
(a)
Left side
- 110 V AC power input
(b)
Bottom
- Relay contacts
(c)
Right side
- Detector card connections, 4-20 mA hook-ups and 24 V DC power input
for DC operation of the 4728.
Note: Switch S1 which is located at the lower right of the P.C. card. The position of this
switch determines whether the 4-20 mA output is to be internally powered from the
4728, or externally powered from an outside source. Care must be taken to be sure
this switch is in its proper position BEFORE an external 4-20 mA loop power source
is connected. Failure to have the switch in the proper position may cause component
failure and void the unitʼs warranty.
The function and operation of all other controls on the 4728 are as described in the
manual.
Содержание 4528
Страница 4: ...Page 4 MNIN003 Issue Rev 0 0 5 19 Page intentionally left blank ...
Страница 13: ...Issue Rev 0 0 5 19 MNIN003 Page 13 Installation Operation Manual Typical Tank Flow Diagram ...
Страница 21: ...Issue Rev 0 0 5 19 MNIN003 Page 21 Installation Operation Manual CX 645 Probe Dimensional Drawing ...