36
CARDIATEK UG 202001-R01
INSPECTION PROCESS AND SCHEDULE
MAINTENANCE PROGRAM
ITEM
ROUTINE
1 M
OR
2 H
3 M
OR
6 H
6 M
OR
12
H
12
M
OR
24
H
Wall Mount
9
Verify Wall Mount Clamps
▪
Verify Top-Down Movement of the Clamps
▪
Verify Quick Release Button operates properly
▪
Verify Handle locks into place appropriately when
turned clockwise
▪
Verify Screws holding the QR-Gripp Clamps are
not loose or missing
9
Inspect the Micro base for cracks, visual damage or
malfunction
X
Floor Mount
9
Inspect the 2 Red T-Shape Handles
▪
Inspect spring/locking system of the red T-Shape
handles
9
Ensure the Standard Base is clear of particles, obstacles
or debris
9
Inspect the feet locking into the track for any damage
or missing parts
9
Inspect spring/locking system of the red T-Shape
handle
9
Inspect the locking mechanism of the Standard Base, if
pushed the blocker goes into the base
9
Inspect the ball bearings if they roll and are clean of
dust and contamination
X
Maintenance Guide
Содержание Cardiatek
Страница 1: ...CARDIATEK USER GUIDE ...
Страница 43: ...www technimount com CARDIATEK UG 202001 R01 43 Return To Table of Contents SAE Certification ...
Страница 44: ...Return To Table of Contents 44 CARDIATEK UG 202001 R01 www technimount com FAA Certification ...
Страница 45: ...www technimount com CARDIATEK UG 202001 R01 45 Return To Table of Contents CE Certification ...