background image

GB

13

7.3 - STARTING-UP THE UNIT

• Power up the unit.
• Turn the water on.
• Start the appliance (see paragraph 5).

CAUTION: 
On three-phase units, make sure that the phase rotation order is correct. If the rotation order is not respected, If
the rotation order is not respected, the phase-sequence controller restricts the unit from operating (indicator OK
off). To fix this, simply invert the 2 phases.

7.4 - CHECKS TO BE MADE

• Water flow-rate.
• The generator is equipped with 1/4 SAE pressure taps at the circulator inlet and outlet, to enable the pressure drop to be

measured using a hydraulic pressure gauge. Use the circulator curves in paragraph 10 to find the water flow rate. 

Note:
In order for the device to operate correctly, there must be a constant flow of water. It must correspond to the data
given in the circulator graphs (in paragraph 10), particularly for the high temperature application (water outlet
greater than 55° C).

• Hydraulic circuit pressures.
• Control system operation.
• Sealing of the cooling circuit (according to the decree of 7th May 2007).

IMPORTANT:
If antifreeze is added (monopropylene glycol), a minium rate of 15% to 20% is needed to avoid any risk of corrosion.

• The LP pressure switch cuts at 0.5 bar.
• The HP pressure switch cuts at 29 bar.

8 - MAINTENANCE INSTRUCTIONS

8.1 - MAINTENANCE

All equipment must be properly maintained in order to provide optimum performance over time. Faulty maintenance can result in
the cancellation of the product guaranty. Depending on the products, maintenance operations consist in the cleaning of filters (air,
water), internal and external exchangers, casings, and the cleaning and protection of condensate tanks. Treating odours and the
disinfection of room surfaces and volumes also contributes to the cleanliness of the air breathed by users.

Carry out the following operations at least once a year 

(the frequency depends on the installation and operating conditions):

- check for leaks on the refrigerating circuit (according to the order of 7th May 2007).
- check for traces of corrosion or oil stains around the refrigerating components,
- inspect the composition and the condition of the coolant and check that it does not contain traces of refrigerating fluid,
- cleaning the exchangers,
- checking the wear parts,
- checking the operating instructions and points,
- check the safety devices: particularly check that the high and low-pressure controllers are properly connected on the

refrigerating circuit and that they disengage the electrical circuit if triggered,

- de-dusting the electrical equipment cabinet,
- checking that the electrical connections are secure,
- checking the earth connection,
- check the hydraulic circuit (clean the filter, water quality, purge, flowrate, pressure, etc.).

• Before carrying out any work on the installation, make sure that it is switched off and that access to it is

prevented.

• Also check the discharge of the compressor capacitor for the single-phase voltages.
• Any work must be carried out by personnel qualified and authorised to work on this type of machine.
• Prior to all maintenance and servicing on the refrigerating circuit, one must first shut down the unit then wait a

few minutes before installing temperature or pressure sensors. Certain equipment, such as the compressor and
piping, may reach temperatures above 100°C and high pressures may lead to serious burns.

IMPORTANT NOTE

Содержание PHT 13

Страница 1: ...aldamento Fluido refrigerante R 407 C Bomba de calor de alta temperatura con equipamiento hidr ulico s lo calefacci n Fluido refrigerante R 407 C Hochtemperatur W rmepumpe mit Hydraulikmodul Nur Heize...

Страница 2: ...humidity of the ambient air very quickly This can modify its lubricant properties and lead in time to the destruction of the compressor MAINTENANCE INSTRUCTIONS 1 Never add oil to the appliance the c...

Страница 3: ...lation check that its power supply is disconnected and locked out 1 4 USE OF EQUIPMENT This device is designed for heating buildings This appliance is not designed to be used by people including child...

Страница 4: ...st not be directed towards surrounding windows vibrations and noise must not be transmitted to a nearby building avoid exposure to salty air or sulphuric gas the proximity of the extractor fan project...

Страница 5: ...he table below Note The unit is designed to be connected to a power supply having a TT neutral regime neutral to ground or TN S regime to neutral as per NF C 15 100 POWER SUPPLY CABLE Section see tabl...

Страница 6: ...f a safety delay is in progress It stays on when the compressor is operating The control probe SD1 is located on the water inlet in the factory The controller is connected on a printed circuit board o...

Страница 7: ...paragraph 5 4 If the light flashes it means that the compressor is starting required but that a safety delay is in progress This light stays on when the compressor has started To stop the unit open t...

Страница 8: ...s 1 and above are accessed Note 2 The normal display level 0 returns automatically after 5 minutes if no buttons are pressed Level 0 Normal display Level 1 Level 2 Level 3 Level 4 Temperature S1 Alarm...

Страница 9: ...tions Go to the PSS section in the menu Briefly and simultaneously press buttons 1 and 2 The message appears Enter the password using buttons 1 and 2 and validate it by simultaneously pressing buttons...

Страница 10: ...tor lamp 7 Note The ventilation can restart after defrosting is completed to prevent excessive pressure build up For special climatic conditions the factory set time counter value of 30 minutes can be...

Страница 11: ...a time delay system in order to respect a maximum number of starts per hour 10 a minimum stop time Cycle inversion valve The valve is actuated during defrost cycles Control hysteresis See the operati...

Страница 12: ...ssure 2 bar That there are no leaks That the machine is stable That the power cables are well fixed to their connection terminals Terminals that are poorly tightened may cause overheating and malfunct...

Страница 13: ...nal exchangers casings and the cleaning and protection of condensate tanks Treating odours and the disinfection of room surfaces and volumes also contributes to the cleanliness of the air breathed by...

Страница 14: ...n the spare parts list for replacing defective refrigeration components Pipes may only be replaced by copper tubing in compliance with standard NF EN 12735 1 Leak detection in the case of pressure tes...

Страница 15: ...8 16 4 14 4 51 4 59 19 64 23 70 26 19 17 4 20 4 60 4 69 19 67 23 70 26 19 18 4 25 4 69 4 78 19 70 23 70 26 19 19 4 31 4 79 4 88 19 73 23 70 26 20 20 4 36 4 88 4 97 19 77 23 70 26 20 21 4 40 4 93 5 02...

Страница 16: ...4 53 4 76 20 08 23 98 26 56 17 4 28 4 62 4 85 20 09 23 98 26 55 18 4 36 4 71 4 94 20 10 23 98 26 53 19 4 43 4 79 5 03 20 12 23 98 26 52 20 4 51 4 88 5 12 20 13 23 98 26 50 21 4 55 4 92 5 16 20 13 23...

Страница 17: ...apacitor C11 M11 capacitor C3 Filter E1 High pressure switch E2 Low pressure switch EV1 Electrovalve J1 Water differential pressure switch KA1 Phase sequence controller KM2 Contactor compressor KM3 Ci...

Страница 18: ...F GB D P I E...

Страница 19: ...F GB D P I E...

Страница 20: ...dificarli senza preaviso En el inter s de mejoras constantes nuestros productos pueden modificarse sin aviso pr vio Unsere Produkte werden laufend verbessert und k nnen ohne Vorank ndigung abge ndert...

Отзывы: