These assembly and operating instructions are intended 
for trained employees. Therefore, we do not mention the 
basic work steps.

The sealing on the heat meter must remain intact! Da-
maged sealing has the immediate consequence of expiry 
of the works guarantee and the calibration. 

Example of a complete installation

Assembly instructions

–  Select a dry, easily accessible location for the heat meter 

or the meter replacement (readout and replacement!). 
The surrounding temperature may not exceed 55 °C.

–  When selecting the installation location, pay attention 

to the length of the fi xed connected cables (2 m). The 
cables may neither be extended nor changed.

–  Also pay attention to suffi cient distance from possible 

sources of electromagnetic disturbances (switches, 
electrical motors, fl uorescent lamps etc).

–  Only install the heat meter in the train of pipes defi ned 

on the nameplate.

–  Air bubbles and air collection in the meter cause mal-

functioning. Therefore, never install it in locations where 
„air bags“ can be formed:

–  The heat meter can be installed both in vertical and 

horizontal conduits. Smoothing sections upstream or 
downstream of the meter are not required.

If possible, use the same installation method within one 
property! The display must be accessible at all times and 
readable without further aids. 

–  Install a dirt catcher upstream of the volumetric fl owme-

ter.

–  Shut-off devices must be installed upstream of the dirt 

catcher and downstream of the water meter.

–  Before assembling the meter, rinse the conduits tho-

roughly – still use the meter replacement for this pur-
pose.

–  If exchanging the meter, make sure to clean the union 

piece connectors‘ sealing surfaces.

–  Open the shut-off devices and check leak tightness.
–  If the temperature of the medium is lower than the sur-

rounding temperature, relieve the volumetric fl owmeter 
of the calculator and use the cast meter variant because 
otherwise the meter can be destroyed by thawing:

–  Implement a function check following assembly.
–  Seal both the free temperature sensor and the calcula-

tor.

Power supply

Standard version: 

3.0 V DC lithium battery,

 

  

12 years‘ working life.

Option: 

24 V AC or 230 V AC power supply, 

 

 

can be retrofi tted on-site.

Do not connect the power supply between two phases 
under any circumstances, otherwise the power supply 
will be destroyed.

Installing the temperature sensors

The return fl ow sensor is integrated in the volumetric 
fl owmeter. The fl ow sensor is installed in a ball valve or 
a  T-piece:

For new installations in pipes 

 25 mm the temperature 

sensors must be installed direct dunking.

OPERATING 

INSTRUCTIONS

Содержание ultra S ll

Страница 1: ...ruhi gungsstrecken vor oder hinter dem Z hler sind nicht erforderlich Innerhalb einer Liegenschaft m glichst einheitlich montieren Die Anzeige muss jederzeit zug nglich und ohne Hilfsmittel ablesbar s...

Страница 2: ...Bus Modul genormt nach EN 1434 3 Anschlussm glichkeit 2 x 2 5 mm galvanischeTrennung maximale Spannung 50V DC Stromaufnahme Eine M Bus Last Adressierung prim r oder sekund r Baudrate 300 oder 2400 Bau...

Страница 3: ...ifschleife 6 Monatsschleife Zur schnellen visuellen Erfassung sind die Schleifen im Dis playmitdenZiffern1bis6gekennzeichnet DieHauptschleife ist mit den aktuellen Daten wie z B f r Energie Volumen un...

Страница 4: ...erscheinen Fehler Codes 1 4 7 im Wechsel mit der Grundanzeige Ausnahme Die Fehler anzeige C 1 wird st ndig angezeigt C 1 1 Grundparameter im Flash oder RAM zerst rt Err1 2 FehlerhafteTemperaturmessun...

Страница 5: ...m or downstream of the meter are not required If possible use the same installation method within one property The display must be accessible at all times and readable without further aids Install a d...

Страница 6: ...ity of connecting 2 x 2 5 mm Galvanic isolation Maximum voltage 50V DC Current consumption one M bus load Primary or secondary addressing Baud rate 300 or 2400 bauds A 2 pole connector block is at tac...

Страница 7: ...oop 2 Due date loop 3 Information loop 4 Pulse input loop 5 Tariff loop 6 Monthly loop The loops are marked in the display with the numbers 1 to 6 in order to enable quick visual recording The major l...

Страница 8: ...ormity TheHYDROMETERGmbHasmanufactureroftheultrasound compact heat meter ultra S ll herewith declares that this device meets the basic requirements and relevant regula tions of the following guideline...

Отзывы: