Chapter 2 Printer Installation
11
2.5
Loading the
Media
Labels or tags can be loaded in the printer. The media loading
procedure depends on which media is going to be used.
1
Open the Top Cover.
Top Cover
2
Lift the Pinch Roller Lever to the ROLLER RELEASE position
to open the Pinch Roller Unit.
Pinch Roller Unit
Pinch Roller Lever
(To ROLLER RELEASE)
3
Loosen the screw on the Supply Shaft Holder Stand.
4
Fit the Supply Shaft Holder Stand to the Supply Shaft, as illustrated
below. The Supply Shaft Holder Stand moves up or down so that
the Supply Shaft is kept level.
Note:
The Supply Shaft cannot be kept level
because of its weight, as the printer
becomes older. So before loading the
media, adjust the Supply Shaft so that
it can be kept level.
Supply Shaft
Screw
Supply Shaft Holder Stand
5
Remove the Supply Shaft Holder Stand from the Supply Shaft,
when adjustment to its height is complete.
Содержание CB-426-T3-QQ
Страница 1: ...TEC Two Color Printer CB 426 T3 QQ Owner s Manual ...
Страница 121: ......
Страница 122: ...PRINTED IN JAPAN EO1 33027 E ...