A S S E M B LY I N S T R U C T I O N S
Picture A
Locate the bottom of the supplied mounting bracket
72”
from the floor.
Level and mark the bracket position.
Drill two holes on mounting bracket 6” from either end
as illustrated.
Caution:
Ceilings and floors may not always be completely parallel,
so adjust bracket level accordingly if necessary.
Picture B
Mark and drill mounting holes in wall using positioned
bracket as guide.
Place fastener through bracket, attach toggle end and
feed through wall.
Secure the toggle bolts. Pull bracket away from wall
while tightening. Other fasteners may differ.
Picture C
Place Cabinet onto mounting bracket and slide down
to lock into position. Connect the RJ-45 cable at the
lower right corner of the TeamBoard (inside the pen
tray). See the TeamBoard Installation and User Guide
for further information.
If wall is not true, shims are necessary to allow doors to
close properly.
Picture D
Note:
Additional safety brackets are located in the pen tray
to avoid cabinet from being lifted up and off bracket.
Flip-down bracket and mark hole locations on pen tray
backing.
Flip up bracket and drill for appropriate wall screws.
Flip hinge down and attach screws.
See the TeamBoard Installation and User Guide and
Quick Start Guide for further information.
LEVEL
MOUNTING
BRACKET
SAFETY
BRACKETS
MOUNTING BRACKET
TOGGLE
BOLT