background image

114- 40020

Rev D

5

of 9

3.7. Installed Headers

Installed headers must meet the requirements provided in Figure 6.

Figure 6

Maximum Post

Rotation (Typ):

Mating End (2

)

Termination End (5

)

Seated Connector

Must be Flush to

0.25 [.010] Max.

3.8. Keying (Military Applications)

Keying plugs can be installed in the connectors to prevent mismating of compatible connectors. The keys must

be installed in slots that have webbing in them. The tab latch must be toward the inside of the connector and

the flat must be on the outside. See Figure 7.

Figure 7

Keying Plug Assembly

Snap--Off

Handle

Latch Tab

Tab Latch

Key In Position

Key Slot

Web

Содержание AMP-LATCH

Страница 1: ...r latches Figure 1 provides contact features and terms used throughout this specification Use these terms when corresponding with TE Connectivity Representatives to facilitate assistance Figure 1 Pola...

Страница 2: ...r tin on the ACTION PIN tail all over nickel underplate 3 3 Intermateability The headers are designed to mate with AMP LATCH Receptacle Connectors such as Novo AMPMODU MTE Connectors FFC Connectors an...

Страница 3: ...PC BOARD HOLE DRILLED HOLE HOLE DIA AFTER SURFACE FINISH DRILLED HOLE DIAMETER A AFTER PLATINGS B PLATING THICKNESS 1 151 0 025 0453 0010 1 02 040 Hot Air Solder Leveling HASL Tin Lead Sn Pb 0 008 00...

Страница 4: ...in Section 5 TOOLING Refer to Figure 5 for seating information When seating the headers onto the pc board make sure the ejector latches are not installed on the headers If the headers already have pre...

Страница 5: ...to 0 25 010 Max 3 8 Keying Military Applications Keying plugs can be installed in the connectors to prevent mismating of compatible connectors The keys must be installed in slots that have webbing in...

Страница 6: ...dures When installing an ejector latch the latch pivot pins must be held at a 15_ angle and inserted into the cover pin slots until bottomed then the latch must be rotated until it is perpendicular to...

Страница 7: ...for hand placement of these headers on the pc board however the following information should be considered S PC Board Support A pc board support should be used to prevent bowing of the pc board durin...

Страница 8: ...5T stand alone machines MEP 6T and MEP 12T and a fully automated machine available AEP 12T Contact the Tooling Assistance Center TAC phone number at the bottom of page 1 for information on these Auto...

Страница 9: ...cted using the information in the preceding pages of this specification and in the instructional material shipped with the product or tooling FIGURE 11 VISUAL AID HOUSING VISUALLY SEATED ON PC BOARD M...

Отзывы: