background image

408- 7114

Rev

B

2

of 4

Select an applicable terminal and proceed as follows:

1. Hold the tool so that the front is facing you.

2. Make sure that the ratchet is released. Squeeze

the tool handles together and allow them to open

fully.

3. Insert the terminal into the locator. Make sure

terminal insulation barrel and wire barrel are facing

tool crimper jaws and tab receptacle is bottomed in

locator. See Figure 3.

4. Hold the terminal in this position and squeeze

the tool handles together until the crimping jaws

close just enough to retain the terminal. Do NOT

deform the insulation barrel or wire barrel.

5. Insert a properly--stripped wire through the

terminal insulation barrel and into the wire barrel.

End of wire must be flush with end of wire barrel.

6. While holding the wire in place, squeeze the tool

handles together until the ratchet releases.

7. Allow the tool handles to open fully and remove

the crimped terminal.

4. MAINTENANCE/INSPECTION

4.1. Daily Maintenance

Remove all foreign particles with a clean, soft brush

or a clean, soft, lint--free cloth. Make sure the proper

retaining pins are in place and are secured with the

proper retaining rings. If foreign matter cannot be

removed easily, or if the proper replacement parts are

not available, return the tool to your supervisor.

Make sure all pivot points and bearing surfaces are

protected with a thin coat of any good SAE 20 motor

oil. Do NOT oil excessively. When the tool is not in

use, keep the handles closed to prevent objects from

becoming lodged between the jaws, and store the tool

in a clean, dry area.

4.2. Periodic Inspection

Regular inspection should be performed by quality

control personnel. A record of scheduled inspections

should remain with the tool and/or be supplied to the

supervisory personnel responsible for the tool.

Though recommendations call for at least one

inspection a month, the inspection frequency should

be based on the amount of use, ambient working

conditions, operator training and skill, and established

company standards. These inspections should be

performed in the following sequence:

Figure 3

Locator

Receptacle Bottomed

in Locator

Insulation

Barrel

Stripped

Wire

Back of Tool

(Wire Side)

Crimper

Jaws

Wire

Barrel

Отзывы: