TE Connectivity 2234800-1 Скачать руководство пользователя страница 35

RBK-X1

 

PN 2234800-1

 

 

    Page 34                                                                                                                           Rev A        Sept 2019 
 

 

4.2.9 

Heater Carriage Jammed 

 

 

Heater Carriage Jams. 

 

 

Power to the motor and heater will remove automatically.

 

 

 

The RBK processor heaters will switch off automatically if the carriage has not reached the front 
sensor in 700ms. Power to the drive motor removed.

 

Heater

’s

 cool down and the RBK Processor will go into Stand-by mode, exactly as if the operator were 

preparing to switch the machine off.

 

 

 

The equipment is connected to an AC mains electricity supply. Before undertaking 
any maintenance or repair, always turn off the equipment and ensure it is isolated 
from the AC supply

 

 

 
 

Clear the jam. Check for signs of damage to Processor. Ref Emergency Heater Chamber

 

Release: 3.2.8

 

 
 
 
 
 
 
 

To re-sett the Processor:

 

 

1.  Switch on the Processor by pressing the I/O Start/Stop Switch for 5 seconds.

 

2.  Press on both start button. 

 

3.  This will move the mechanism back and reset the fault condition.

 

4.  Processor is now ready to use.

 

 

Содержание 2234800-1

Страница 1: ...1 P a g e 1 111 Page 1 Customer Manual RBK X1 PN 2234800 1 Operating manual no 409 35012 Language English...

Страница 2: ...product and in no case will TE Connectivity Raychem are liable for any incidental indirect or consequential damages arising from the sale resale use or misuse of the product TE Connectivity Raychem S...

Страница 3: ...2234800 1 Page 2 Rev A Sept 2019 Disposal RBK X1 This product must not be disposed of as municipal waste Amendment Record Rev Content Amended By Date Change Request No Rev A Initial Release Cham Zhu...

Страница 4: ...s 12 2 3 5 Servicing 12 2 4 Warnings and Labels 13 3 Software 14 3 1 Heat Parameter 16 3 2 Sequence Production 17 3 3 Sequence Setting 18 3 4 Production Setting 19 3 5 Maintenance 20 3 6 Auto Calibrat...

Страница 5: ...3 Troubleshooting 36 4 3 1 Preliminary Checks 36 4 3 2 Troubleshooting Table 36 4 4 Recommended Spare Parts 39 4 5 Repair 42 4 5 1 Circuit Protection Device 42 4 5 2 Gaining Access 43 4 5 3 Heater El...

Страница 6: ...is within 10 C editable of the set operating temperature Activated by two start buttons the heating chamber moves forward enclosing the joint area It remains in place for the set timed period and then...

Страница 7: ...on to interrupt cycle 4 Dual Release allow removal of splice by hand 5 Grippers hold cable splice in heating chamber 6 Calibration Socket Connect to the UHI temperature probe to access auto calibratio...

Страница 8: ...rrent PN Display product size or PN stored in the current selected process button 5 Set Value Display temperature time stored in the current selected process button 6 Production Counter 7 Real time St...

Страница 9: ...7 Main Power Switch Used to turn off power to the RBK X1 when in stand by mode 8 Fan Fuse 240V 1A anti surge 9 Heater Fuse 240V DC 3A anti surge 10 Cooling Fan Operates above 190 C heater temperature...

Страница 10: ...y external device to the following outputs below a ferrite core must be clamped to every connection used The ferrite clamp must contain one loop Connection requiring ferrite clamp WITH ONE LOOP 2 Air...

Страница 11: ...ded during the process cycle Jamming of the operating mechanism may prevent the auto retraction of the heater chamber In this event the RBK processor heaters will switch off automatically Follow Heate...

Страница 12: ...STING Do NOT Flash Test protection circuits fitted to this equipment may be damaged INSULATION RESISTANCE TESTING Do NOT exceed 250V DC protection circuits fitted to this equipment may be damaged Powe...

Страница 13: ...hen handling finished wiring assemblies immediately after ejection from the heating chamber Special care must be taken when handling the calibration UHI probe immediately after ejection from the heati...

Страница 14: ...The RBK X1 carries a label shown below which displays the product part number PCN product description electrical rating information The following conventions are used in the manual Information to pre...

Страница 15: ...ity Input ID and password in this window For example we are trying to log on as Engineer then we should input B in user ID column and input 12345 in Password column Then click on OK button You would f...

Страница 16: ...main interface Choose the setting item access to below different interface Main Interface Sequence production Heat parameter Production setting Maintenance Sequence setting System Parameter Error Log...

Страница 17: ...it the parameter 2 Press on the quick button then you would find the original parameter stored in will show on and 3 Click on the value on to input the new value 4 Press on the quick button for 5 seco...

Страница 18: ...0 4 After finishing the current process 3 the green light will jump to the next process 2 5 When we completed the last process 5 the green light will jump to the first process 3 We already completed...

Страница 19: ...ck buttons according to the sequence you would like to set 3 2 1 3 5 for example 5 You would find the quick button you selected will show on Currently touch screen can store 15X sequence Each sequence...

Страница 20: ...re a If you input the value when processor complete the setting production quantity on the main interface will pop up a tip complete to remind the operator production is completed see below capture b...

Страница 21: ...operation cycle after leave factory Can be reset by engineer 5 Heating element timer which is designed to indicate the hours the heating element operate It is required to reset when replaced the heat...

Страница 22: ...r the probe has been inserted into the front socket This allows the heating chamber to stabilise 2 Connect the UHI probe to the front panel socket a Touch screen entry Auto Calibration interface autom...

Страница 23: ...esired value measured value negative result If above adjust OFST to measured value desired value positive result 5 Wait 25 minutes for temperature to stabilise 6 Repeat 3 and 4 if necessary 7 After OF...

Страница 24: ...elding equipment 2 Switch to allow the the processor to communicate with external device 3 These values are showing the parameter temperature time transferred from external devices 4 These values are...

Страница 25: ...racter received including the SOH the longitudinal addition checksum is maintained up to and including byte 11 Overflow of the checksum beyond a byte boundary is discarded This single byte checksum is...

Страница 26: ...5 PID control These parameters have to be carefully adjusted together and are factory set Proportional Band Area around the selected process temperature where the output is at a level other than 100...

Страница 27: ...tan by time the machine is in standby mode automatically Press the IO button for 5s to power on the machine Failed to find home position When power on the machine the heating chamber isn t on home pos...

Страница 28: ...achine work well before leaving factory To start the circle test 1 Switch to 2 Edit the test time if need on default value 60 min 3 Press on both start button then test cycle will start 4 When time di...

Страница 29: ...regulations 4 1 3 Location RBK X1 is designed to be installed and operated in industrial environments However it should not be used near explosive or flammable materials or in a location where it wou...

Страница 30: ...r and its stored parameter will be shown on the main interface and they can be used repetitively until another process button is selected 10X process quick buttons 4 2 3 Sequence Production mode Allow...

Страница 31: ...rrect process button is selected for the task required a The active button is shown on the main interface 6 When the Heater Indicator turn green machine is ready to start process Switch OFF 1 Ensure t...

Страница 32: ...d position over splice to be processed 3 Insert the cable splice into the Processor grippers Align the center of the splice and product ends with the guide markers on the Perspex shield and Guard 4 Pr...

Страница 33: ...the E STOP is activated it will immediately move to the rear and eject the splice being processed Care should be taken in handling the splice as the splice nugget and surrounding area may be hot The...

Страница 34: ...ected to an AC mains electricity supply Before undertaking any maintenance or repair always turn off the equipment and ensure it is isolated from the AC supply Allow machine to cool down before starti...

Страница 35: ...ly as if the operator were preparing to switch the machine off The equipment is connected to an AC mains electricity supply Before undertaking any maintenance or repair always turn off the equipment a...

Страница 36: ...ck the cooling fan is operating correctly and air is flowing through the rear vent panel 2 Remove front cover Check for correct clearance a minimum of 75mm clear space and obstructions 3 Wire Grippers...

Страница 37: ...hooting Table Problem Possible Cause Verification Solution All LED s OFF No power Unplug mains power cable Check mains supply present Restore power supply Mains Switch not in the ON position and or th...

Страница 38: ...ring and connections Adjust sensor position or replace if required Load sensor failed or stuck ON Check sensor gap and position Sensor should be illuminated Check wiring and connections Adjust sensor...

Страница 39: ...h off procedure not being observed Switch off at I O switch Fan will continue to run until 190 C and then switch off Blue stand by led will be lit Ensure correct switching procedures are carried out C...

Страница 40: ...art No Note Main Equipment 2234800 1 View Window 2234897 1 Start button 2234980 1 Contact Start button 2234984 1 Storage Battery 2234971 1 Each machine would need 2X Process Quick button 2234981 X X b...

Страница 41: ...f lower heater 2234991 1 See section 5 3 2 how to replace the heating element Thermocouple 2234990 1 Mounting on lower heating element Cooling Fan 2234963 1 Remove the Top cover to replace this Fan St...

Страница 42: ...Right cover PLC Module 2234964 1 Locate in Right Cover Safety Relay 2234967 1 Locate in Right Cover Touch Screen 2234977 1 Temperature controller 2234968 1 Locate in left cover Reset Spring Latch Ass...

Страница 43: ...Y REPAIR OR REPLACEMENT THE MACHINE HAS A CAPACITOR AS PART OF THE AUTO RETRACT FEATURE NORMAL PRECAUTIONS REGARDING DISSIPATION OF STORED ENERGY MUST BE TAKEN PRIOR TO ANY SERVICE OR REPAIR AFTER COM...

Страница 44: ...00 1 Page 43 Rev A Sept 2019 4 5 2 Gaining Access To gain access to the internal components the side and top covers must be removed Use the correct size Key Top Cover Securing Screws 4X Left Cover Sec...

Страница 45: ...RBK X1 PN 2234800 1 Page 44 Rev A Sept 2019 Right Cover Securing Screws 7X...

Страница 46: ...be easily removed from cover See picture above in yellow circle 4 Remove the 2X upper heater mounting screws on top of red heating element cover with one hand to hold the heating element avoid falling...

Страница 47: ...alibration tools 288869 000 Standard UHI temperature calibration probe 952687 000 Extension cable 4 6 2 Power Cord Transformer 2234780 1 Power Cord EU Packed in standard machine Processor use in Europ...

Страница 48: ...4800 1 Page 47 Rev A Sept 2019 4 6 3 Centering Device TBD Centering Device Fixture TBD Software upgrade 4 6 4 Multi wire Fixture 2234710 1 Multi wire Fixture 4 6 5 Stub Splice Fixture 2234801 1 Stub S...

Страница 49: ...9533 7 Air Cooling kit air flow controller 4 6 7 Welding machine interface Schunk 2234989 1 Service Welding machine interface Schunk 4 6 8 Barcode Scanner 2234781 1 Scanner 2234782 1 Cable assembly wi...

Страница 50: ...ding on wire size and number of wires used Mains Fuses 2 x 240V 3 15A T anti surge Line and Neutral Product Range RBK ILS 125 QSZH Sizes 1 to 3A RBK ILS 85 Sizes 6 1 to 12 3 For other Raychem TE Produ...

Отзывы: