TCL U-MATCH-R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL
205
2.6.3.4 Cut the Selected Pipe with Pipe Cutter
➢
Make the section flat and smooth.
Lean
Crude
Burr
2.6.3.5 Insulate the Copper Pipe
➢
Before test operation, the joint parts should not be heat insulated.
2.6.3.6 Flare the Pipe
➢
Insert a flare nut into the pipe before flaring the pipe
➢
According to the following table to flare the pipe
Pipe diameter
Flare dimension A (mm)
Flare shape
Min
Max
1/4" (6.35)
8.3
8.7
3/8" (9.52)
12.0
12.4
R0.4~0.8
1/2" (12.7)
15.4
15.8
5/8" (15.9)
18.6
19.1
3/4" (19)
22.9
23.3
➢
After flared the pipe, the opening part must be seal by end cover or adhesive tape to avoid duct
or exogenous impurity come into the pipe.
Содержание U-MATCH-R32 Series
Страница 1: ...TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL...
Страница 21: ...TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 20 30K 36K...
Страница 22: ...TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 21 42 48K 55K...
Страница 28: ...29 TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 36K 55K Body dimension 840X290X840...
Страница 32: ...32...
Страница 40: ...40 TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 36K 42K 48K 55K Three phases unit...
Страница 43: ...43 TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 36K 42K 48 55K three phase models...
Страница 90: ...TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 205 Ceiling Floor Type Unit 1 phase 12k 30 k...
Страница 91: ...TCL U MATCH R32 SERIES DC INVERTER AIR CONDITIONERS SERVICE MANUAL 205 Ceiling Floor Type Unit 1 phase 36k...