新建文件夹
(3)Test and Alignment Specification for NT63
Series (v0 01) 170612
Page 13 of 25
Targets
Tolerances
COOL
NORMAL
WARM
ALIGNMENT
MEASUREMENT
Coordinate “x”
Offered by R&D PQ
engineer
± 0.003
± 0.020
Coordinate “y”
± 0.003
± 0.020
Important:
If measurements are performed on whatever else LED panel with Minolta CA210
, it’s required to
calibrate additional channel (ex: CH01) using relative following offsets (CH00 remains for CCFL panel):
+0.002
for “
x
”
and
+0.012
for
“
y
”.
Note
④
:
See WB list as follows for more details.
▪
Cloning
Once a TV is well aligned and prepared (channels
maps, volume, picture presets…), user can prepare golden clone
image that can be copied on demand to all further TV production lot of same TV. To access cloning function, you can
select
“
Factory menu
USB Clone && Update
”, Scroll down to “
TV to USB
” or “
USB to TV
” and press RCU “
OK/
►”
key to process. 4 BIN images will be created, overwritten or read on USB stick (pen drive) depending on chosen
template like following: “
database\database\***.db
”. These files need to be used strictly with MT5655 SoC platform as
depending on SW structure.
Other faster access methods via UART/IR commands
are available on enclosed SIACP requirements (rev. v3.9).
2.4. High Pot and Insulating Resistance Tests
At the end of the process, a “High Voltage” and an “Insulating Resistance” tests are required to fulfil Safety
Electrical requirements (CEI 65065).
▪
High Voltage Withstanding requirements
▪
Insulating Resistance requirements
-
“Voltage”
3500
VAC
-
“Voltage”
500 VDC
-
“Max Leakage Current”
10 mA
-
“Threshold Min”
4M
Ω
-
“Test Time”
3 sec
-
“Test Time”
2 sec
2.5. SHOP-END Test
At final process stage, it’s necessary to perform “
Reset shop
” before any packing to leave Factory mode and
restore User default presets.
This function is accessible by selecting
“
Factory menu
Reset Shop
”, then pressing RCU “
OK/
►” key. Other
faster methods via UART/IR commands are available on enclosed SIACP requirements (rev. v5.4).
Содержание 32S6S
Страница 12: ...3 Test and Alignment Specification for NT63 Series v0 01 170612 Page 5 of 25...
Страница 46: ...6 Power Supply Block Diagram 12...
Страница 47: ...5 Chassis Block Diagram 11...