background image

Maintenance & Inspection

General

The

 Levitator 4 

should be inspected and maintained in accordance with the 

recommendations as detailed in BS-EN 1176 part 7: Guidance on installation, 

inspection, maintenance and operation for playground equipment.
If any part of the equipment is found to be unsafe during an inspection and that part 

cannot be repaired or replaced immediately, the equipment unit or part(s) concerned 

should be secured against use. This may involve immobilisation or removal from site.

Important note: 

The frequency of inspection will vary with the type of equipment or 

materials used and other factors, e.g. heavy use, levels of vandalism, coastal 

location, air pollution, age of equipment etc.

Routine Visual Inspection

A routine visual inspection enables the identification of obvious hazards that can 

result from vandalism, use or weather conditions, e.g. broken parts.
A daily routine visual inspection is recommended especially for playground equipment 

that has heavy use and/or is subject to vandalism and should include the inspection 

of the following as a minimum:

General equipment and surface cleanliness

1.

Equipment ground clearances are maintained

2.

Foundations not exposed, loose in the ground or cracked

3.

Parts not missing or damaged

4.

Surface finishes not damaged, rusting or deteriorating

5.

Connections and bolts are secure and tight

6.

Bearings are free running

7.

Safety surface (if installed) not compacted, damaged or contaminate

8.

Product Levitator-4 Produced by Tayplay Ltd

For further information and technical assistance regarding the cone climber range, 

please contact the original manufacturers at:

Tayplay Ltd

Unit 13A Riverview Business Park

Friarton Rd

                    

           Tel:

    ++44(0)1738 449 084

Perth                                 

  Fax:

    ++44(0)1738 449 094

PH2 8DF

                                

 email:  

[email protected]

Scotland                               

 Web: 

   www.tayplay.com

Retension the Rope

Periodic checks on tension will help assist in the durability of the product.

After initial tension is complete, the net will stretch approximately 1% over the 

first two weeks of use. Following this initial period, the net needs to be fully 

retension by following the original instructions - Tighten the Net.

It is recommended that subsequent checks on tension should be carried out at

monthly intervals and adjusted as required.

Product 

Levitator-4

Page Eight

Содержание Levitator 4

Страница 1: ...e used by children from 3 years of age and has been manufactured to exceed the European playground standards EN1176 1 2008 and EN1176 11 2014 The following installation instructions should be adhered...

Страница 2: ...bber safety surface as shown above is needed See table below for recomended Surface Types and Depths Space requirements Safety Clearances The requirements for space and safety clearances are extracted...

Страница 3: ...f the foundation feet 1 Laser Level 2 20m Measuring Tape 3 JCB Excavator 4 Set Timber 5 Manual Tools Spade Sledge Hammer Claw Hammer Nails 6 A252 Steel Reinforcement Mesh It is recomended that you hav...

Страница 4: ...tion position Excavation Foundation Positioning Procedure In loose ground it may be necessary to use timber framework or shuttering to prevent soil falling into the hole It will also prevent an unnece...

Страница 5: ...d layout the feet using the measurements above These will position around the already place ground chain points Bore 10mm holes 130mm deep for the feet to be bolted directly ontop of the concrete surf...

Страница 6: ...w unwrap the rubber membrane and net assembly and lie in the correct orientation The rope netting and reinforced rubber membrane need to be unattached before connecting the net to the legs Work your w...

Страница 7: ...n your net is wound up The net will need to be tensioned by fully winding up the rigging screws at a later date See maintenance for more Product Levitator 4 Produced by Tayplay Ltd Reinforced Rubber M...

Страница 8: ...e inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundations not exposed loose in the ground or cracked 3 Parts not m...

Отзывы: