Chain Positions

Product Levitator-4 Produced by Tayplay Ltd

Excavation & Foundation 

Positioning

Procedure

Once the concrete has cured the feet can be attached to the concrete blocks. Measure 

and layout the feet using the measurements above. These will position around the 

already place ground chain points. 
Bore 10mm holes, 130mm deep for the feet to be bolted directly ontop of the concrete 

surface using the Hilti Bolts supplied (See lower right image).

O

N

Foundation Positioning

With the Feet positions 

all measurements are 

taken from 5mm holes 

positioned at the front 

of the leg, and in front 

of the lug, at the back 

of the foot.

Product

Levitator-4

Page Five

Содержание Levitator 4

Страница 1: ...e used by children from 3 years of age and has been manufactured to exceed the European playground standards EN1176 1 2008 and EN1176 11 2014 The following installation instructions should be adhered...

Страница 2: ...bber safety surface as shown above is needed See table below for recomended Surface Types and Depths Space requirements Safety Clearances The requirements for space and safety clearances are extracted...

Страница 3: ...f the foundation feet 1 Laser Level 2 20m Measuring Tape 3 JCB Excavator 4 Set Timber 5 Manual Tools Spade Sledge Hammer Claw Hammer Nails 6 A252 Steel Reinforcement Mesh It is recomended that you hav...

Страница 4: ...tion position Excavation Foundation Positioning Procedure In loose ground it may be necessary to use timber framework or shuttering to prevent soil falling into the hole It will also prevent an unnece...

Страница 5: ...d layout the feet using the measurements above These will position around the already place ground chain points Bore 10mm holes 130mm deep for the feet to be bolted directly ontop of the concrete surf...

Страница 6: ...w unwrap the rubber membrane and net assembly and lie in the correct orientation The rope netting and reinforced rubber membrane need to be unattached before connecting the net to the legs Work your w...

Страница 7: ...n your net is wound up The net will need to be tensioned by fully winding up the rigging screws at a later date See maintenance for more Product Levitator 4 Produced by Tayplay Ltd Reinforced Rubber M...

Страница 8: ...e inspection of the following as a minimum General equipment and surface cleanliness 1 Equipment ground clearances are maintained 2 Foundations not exposed loose in the ground or cracked 3 Parts not m...

Отзывы: