36 / 188
●M310 the first maintenance is carried o
ut for the first 1000 kilometers (621mile) or 3 months (whichever arrives first), and
thereafter regular maintenance is carried out every 5000 kilometers (3107mile) or 15 months (whichever arrives first). M125 the
first maintenance is carried out for the first 1000 kilometers (621mile) or 3 months (whichever arrives first), and thereafter
regular maintenance is carried out every 4000 kilometers (2485mile) or 6 months (whichever arrives first).
●Replacement of unqualified parts will cause accelerated wea
r of your vehicle and shorten its service life.
●Check the brake disc, muffler, spark plug, coolant and other items after cooling down.
●Pay attention to protection when replacing brake fluid and coolant to avoid contact with skin and eyes and cause injury
. At the
same time, it is necessary to avoid dripping onto the surface of the parts and damaging the paint or surface.
●The waste generated in the maintenance process, such as cleaning agent, waste engine oil, etc., should be properly disposed
of, and random dumping is prohibited to avoid environmental pollution.
●The items listed in the needle are used in regular environments. If they are often used in harsh environments, the frequency
of
maintenance should be increased.
●Stee
ring system, braking system, electronic fuel injection system, shock absorber and wheels are all key components, and it is
recommended to be carried out by a qualified maintenance organization.
M310 Air filter (filter element), air inlet
filter element
Step
:
1. Support the vehicle firmly
Prop up the vehicle with the main bracket and put down
the side brackets, as shown in the figure.
2. Remove the left engine cover
a. Use your fingers to pull out the decorative buckle; note
that vehicles produced after March 23, 2021 will only have
this decorative buckle, and early-produced vehicles do not
have this decorative buckle.
Use 4# inner hexagon to remove the M6×14 bolt as shown
in the figure. The bolt here cannot be removed temporarily,
just loosen it completely.
b. Use 4# inner hexagon to remove the 4 M6×14 bolts as
shown in the figure.
c. Pull out the front part of the left engine cover first and
then move it about 30mm (1.2 in) in the direction of the rear
mudguard to remove it. The bolts removed in the second
step will fall off at this time. Early production vehicles have
the shock-proof sponge shown in the figure, if it has fallen,
proceed to the next step, otherwise, remove it first. Vehicles
that do not have it proceed directly to the next step.
3. Remove the air inlet cover
a. Use 4# inner hexagon to remove the M6×16 bolt as
shown in the figure. The bolt here cannot be removed
temporarily, just loosen it completely.
Содержание ZONTES 310T-M 2022
Страница 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Страница 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Страница 115: ...115 188 Electrical schematic diagram of EFI system ...
Страница 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Страница 157: ...157 188 Front fork exploded view The M125 are similar to the M310 taking the M310 as an example ...
Страница 158: ...158 188 Exploded view of lower link board The M125 are similar to the M310 taking the M310 as an example ...
Страница 173: ...173 188 ...