Except for person/s responsible for lifting and positioning of the tank in the

excavated hole, there must not be any person within 20m of the installation site

during the lifting and positioning of the tank. Excavation Instructions show

excavated walls to be perpendicular. However, depending on the soil conditions,

the excavator may need to batter or retain the side walls to ensure they don’t

cave in during installation.

Level the base of the hole using an excavation bucket with a laser level attached.

Ensure that the excavated ground or base material is capable of

carrying loads of approximately 8 tonne.

The ABS5000 must be level in both inflow/outflow direction and 90° to the

inflow/outflow direction (<1°  deviation).

Backfilling - Use sand or excavated material/spoil with maximum particle size

of 300mm. Backfilling of excavation to be completed in not more than 500mm

equally distributed layers around the tank perimeter. Ensure that sand or

excavated material does not fall on the lid of the ABS5000 as this will fall into

the system through the manholes and clog the system and irrigation pump.

Ensure that the backfill material is kept at least 100mm below the surface of

the systems lid.

Evenly fill each system with approximately 5,000L of water through the

centre  Chambers  to  prevent  movement  through  the  ground  as  the

water pressure enters the system.

Organise drainage contractors to connect the main sewer line to the

system and between Tank 1 & 2. The drainage connection is a standard

100mm PVC sewer inlet.

Refer to Excavation & Lifting Instructions on Pages 10 and 11

 

Содержание ABS5000

Страница 1: ...Installation Manual ADVANCED BLOWER SYSTEM 5000 ABS5000 Standard...

Страница 2: ...8 9 COMMISSIONING 8 10 EXCAVATION LIFTING INSTRUCTIONS 9 a ABS5000 Excavation Instructions 9 b ABS5000 Lifting Instructions 10 11 ELECTRICAL CONNECTION DIAGRAM 11 12 Note Do not act solely on the basi...

Страница 3: ...ced if the ABS5000 is not immediately installed SLIPPERY WHEN WET During cleaning maintenance repair work the surrounding area may become extremely slippery due to spilt water Caution is to be taken w...

Страница 4: ...moisture for heavy equipment access Weather conditions 5 MARK OUT To ensure the ABS5000 is installed in the position nominated by the Home Owner Builder the location of the ABS5000 should be marked o...

Страница 5: ...n behind the vehicle before placing it into the prepared hole Maximum reach from the rear of the truck to the centre of ABS5000 will vary depending on the size of the crane To enable the ABS5000 to be...

Страница 6: ...Page 6 of 13...

Страница 7: ...n allows for the diversion of storm water and surface waters away from the system Width Height Inlet Height from bottom of tank Inlet Depth from ground level Required Base 5 7mm Drainage Gravel Sand H...

Страница 8: ...inflow outflow direction 1 deviation Backfilling Use sand or excavated material spoil with maximum particle size of 300mm Backfilling of excavation to be completed in not more than 500mm equally dist...

Страница 9: ...is completed prior to having the system commissioned Tanks is full of water 5 000lt each Effluent Disposal area is installed Effluent Disposal Area feed line is connected to ABS5000 Tank 2 Electrical...

Страница 10: ...13 NON TRAFFICABLE LOADS ONLY NON TRAFFICABLE LOADS ONLY 6000 mm 2425 mm 2425 mm 100mm of 5mm 7mm drainage gravel or sand 100mm of 5mm 7mm drainage gravel or sand 100mm Inlet Lifting Holes Lifting Ho...

Страница 11: ...ing Holes 1 Always use a Spreader Bar and ensure it is certified 2 Lower chains through TOP lifting holes provided in the lid of the ABS5000 3 Loop chains through the lifting holes directly below on t...

Страница 12: ......

Страница 13: ......

Отзывы: