background image

1.

To install the screen post, place
worksurface face down on a
solid surface or floor.  Place a
wooden block underneath the

pre-drilled holes and level the

worksurface.  Drill through the

pre-drilled holes with a 5 mm

V-point drill bit, (Figure 1).

2.

Flip the worksurface and place
it on top of the assembled

worksurface supports or

elevated surfaces with the
topside facing up.  Place screen
post  in position shown in
(Figure 2).  Use four screws (4)
to attach the screen post to the
surface.

screen post to surface

IMPORTANT NOTES:

Do not drill all the pre-drilled
holes, drill only where required

as per furniture layout
configuration.
Check the layout for post
positioning.

torpedo level

tools & hardware needed

drill

# 2 Robertson

long bit

5 mm  V-point
drill bit

FIGURE 1

FIGURE 2

#8 x 2" Washer

head screw

wooden block

measuring

tape

17 Scene

MARCH 2016

Содержание Scene

Страница 1: ...Scene installation guide March 2017...

Страница 2: ...ost support 31 worksurface to worksurface flush support 32 low credenza to worksurface wide fixed supports 34 low credenza to worksurface fixed support 35 Storages 36 41 front inset spacer to high cre...

Страница 3: ...ators in advance if necessary Site Preparation 1 Clear all obstacles that could interfere with the installation process 2 When doing a reconfiguration ensure that all furniture to be re used are clear...

Страница 4: ...and marks use a commercial cleaner such as Cabinet or Countertop both manufactured by Magic American Corporation Acrylic Dust regularly to keep surfaces free of dust particles Clean any dirt with a da...

Страница 5: ...1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Figure 2 SHARED 2 SURFACES end shared shared post 1 1 1 1 1 1 1 1 1 1 1 1 1 1 post 1 1 1 1 1 1 post 2 Grommet hole 1 Pre drilled holes 2 2 2 2 IMPORTANT NOTES...

Страница 6: ...ed post 1 1 1 1 post post 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SHARED 4 SURFACES 2 Grommet hole 1 Pre drilled holes IMPORTANT NOTES Do not drill all the pre drilled holes drill only where r...

Страница 7: ...END TO END Figure 1 1 Post 2 Privacy Screens 3 Worksurface screen definition Figure 1 1 2 3 1 1 1 2 3 7 Scene MARCH 2016...

Страница 8: ...END TO SHARED Figure 2 1 Post 2 Privacy Screens 3 Worksurface screen definition cont d Figure 2 WORKSURFACE OVER 66 WORKSURFACE 66 BELOW 1 2 3 1 3 1 1 3 2 8 Scene MARCH 2016...

Страница 9: ...SHARED TO SHARED Figure 1 1 Post 2 Privacy Screens 3 Worksurface screen definition cont d 1 2 3 1 2 2 1 1 3 3 3 3 Figure 1 WORKSURFACE 66 BELOW WORKSURFACE OVER 66 9 Scene MARCH 2016...

Страница 10: ...t 4 Post cap 5 Post screen definition cont d 2 3 1 Figure 1 4 Figure 2 TACKBOARD FELT WHITEBOARD MELAMINE SCREEN 1 Screen extrusion 2 Tackboard Felt Whiteboard Melamine screen 3 Screen gasket 4 Post c...

Страница 11: ...ACCESSORY SCREEN 1 Accessory screen 2 Post 3 Post cap screen definition cont d 2 1 Figure 3 3 11 Scene MARCH 2016...

Страница 12: ...led instructions for planning with the Scene product line 1 Position all the storages Towers cabinets lateral files and cabinets 2 Assemble all worksurface supports gables and reinforcement bars insta...

Страница 13: ...3 Install the posts to the surfaces Position all worksurfaces Mount them to the worksurface supports or credenza 4 Install the screens installation sequence cont d STEP 3 STEP 4 13 Scene MARCH 2016...

Страница 14: ...support to worksurfaces Position the worksurfaces and mount it to worksurface or credenza 6 Position all spacers and mount them to credenza installation sequence cont d STEP 5 STEP 6 low credenza supp...

Страница 15: ...ort to flag storage Position the flag storage and mount them to the surface 8 Position and mount the mounted storages installation sequence cont d STEP 7 STEP 8 flag storage flag support mounted stora...

Страница 16: ...nted screen trough and trough mounted modesty 10 Install task lights cable management trough mounted receptacle and data Mount the accessories to accessory rails installation sequence cont d STEP 9 ST...

Страница 17: ...orts or elevated surfaces with the topside facing up Place screen post in position shown in Figure 2 Use four screws 4 to attach the screen post to the surface screen post to surface IMPORTANT NOTES D...

Страница 18: ...the worksurface Figure 1 2 Slide the bottom screen extrusion down the screen post Figure 2 For felt screen installation see felt screen to screen post screens to screen post measuring tape tools hardw...

Страница 19: ...een post grooves Figure 3 Slide the gasket down the screen post until it bottoms out 4 Slide the screen into the gaskets within the posts Figure 4 screens to screen post cont d tools hardware needed F...

Страница 20: ...sion on top of the screen 6 Repeat steps 3 to 5 until all screens are in position except accessory screen shown in Figure 5 screens to screen post cont d tools hardware needed FIGURE 5 FIGURE 6 measur...

Страница 21: ...7 Place the post top caps and fillers as shown in Figure 7 screens to screen post cont d tools hardware needed FIGURE 7 measuring tape fillers top cap 21 Scene MARCH 2016...

Страница 22: ...the bottom extrusion sideways Figure 1 2 Slide the appropriate screen gasket down the felt screen Figure 2 felt screen to screen post measuring tape tools hardware needed FIGURE 1 FIGURE 2 22 Scene MA...

Страница 23: ...n down the screen post until it bottoms out Figure 3 4 Place the top screen extrusion on top of the screen Figure 4 felt screen to screen post measuring tape tools hardware needed FIGURE 3 FIGURE 4 23...

Страница 24: ...5 Place the post top caps and fillers as shown in Figure 5 felt screen to screen post measuring tape tools hardware needed FIGURE 5 24 Scene MARCH 2016...

Страница 25: ...d connector to the center gable with 1 4 20 1 inch quadrex pan head screw at the bottom Figure 1 and above Figure 2 3 Proceed to attach the other end of the reinforcement bar to the required gable too...

Страница 26: ...nch quadrex pan head screws at the bottom Figure 1 and above Figure 2 3 Proceed to attach the other end of the reinforcement bar to the required gable end reinforcement bars to open end gable tools ha...

Страница 27: ...2 Attach the no connector reinforcement bars tothe worksurface with 10 1 inch oval head screws Figure 2 no connector reinforcement bars to worksurface Figure 2 Figure 1 3 1 16 inches 3 1 16 inches 2...

Страница 28: ...led secure the worksurface to the reinforcement beams with 10 1 inch oval head screws Figure 1 reinforcement beams to worksurface 2 Robertson long bit tools hardware needed drill Figure 1 10 1 oval he...

Страница 29: ...e instructions for end reinforcement bars to open end gables Figure 1 short beam shown 2 Attach the the flag storage support with reinforcement to the bottom of the flag storage with 10 1 inch oval he...

Страница 30: ...h 1 1 2 inch flat head screws through the mounting holes provided Figure 3 shows a flag worksurface on one side flag storage support cont d 2 Robertson long bit tools hardware needed drill Figure 3 1...

Страница 31: ...e of the support plate to the edge of the surface Figure 1 D top shown 2 Secure the single post support with 10 1 inch oval head screws Figure 2 single post support Figure 1 Figure 2 11 1 4 inches 2 R...

Страница 32: ...urfaces on top of the assembled supports Figure 1 2 Secure the worksurfaces together with flush plates and 10 1 inch oval head screws Figure 2 worksurface to worksurface flush plate Figure 2 Figure 1...

Страница 33: ...and secure the remaining worksurfaces with flush plates and 10 1 inch oval head screws Figure 3 worksurface to worksurface flush plate 2 Robertson long bit tools hardware needed drill 10 1 oval head...

Страница 34: ...rksurface above the credenza and secure the flush plates to the surface with 10 1 inch oval head screws Figure 2 3 Align the credenza to the worksurface low credenza to wide worksurface fixed supports...

Страница 35: ...ch oval head screws Figure 1 2 Mount the worksurface above the credenza and secure the reinforcement beams to the surface Figure 2 low credenza to worksurface fixed support 2 Robertson long bit tools...

Страница 36: ...ides of the drawer Figure 1 2 From the inside of the credenza drill through the top following the corresponding drilling points to match the required worksurface spacer Figure 2 front inset spacer to...

Страница 37: ...in front 4 Secure the inset spacer to the credenza with 10 24 1 1 4 inch machine screws Figure 4 front inset spacer to high credenza installation cont d 2 Robertson long bit tools hardware needed dril...

Страница 38: ...ts on the required worksurface depth Figure 1 2 Secure the worksurface to the high credenza with 10 24 1 1 4 inch machine screws Figure 2 worksurface to high credenza installation Figure 1 DRILL POINT...

Страница 39: ...unted with 1 2 inch space at the front of the credenza flush on the sides and at the back Figure 2 credenza mounted storage to high credenza installation Figure 2 INSET SPACER HIGH CREDENZA CREDENZA M...

Страница 40: ...mounting the wooden cleats on the wall listed in Figure 1 3 Level the wooden cleat and attach it to studs with 10 3 inch wood screws Figure 2 overhead storage attachment to dry wall with wood studs W...

Страница 41: ...overhead storage unit and its contents Failure of the wall to support all imposed loads may result in property damage and or personal injury When in doubt the use of other methods of storage such as...

Страница 42: ...into the accessory bar channels and push it down For the paper sorter angle it at 30 degrees place the hooks at their desired location into the accessory bar channels release them down and the paper...

Страница 43: ...igure 1 2 Attach the surface mounted screen to the underside of the worksurface using 10 1 oval head screws Figure 2 surface mounted screen measuring tape tools hardware needed drill 2 Robertson long...

Страница 44: ...desty screen to the wire management trough using 1 4 20 round head screws with three washers on each screw Figure 1 trough mounted modesty screen measuring tape tools hardware needed drill 2 Robertson...

Страница 45: ...ough 1 Ensure the worksurface is properly supported and all brackets are secured 2 Position the worksurface wire management trough at the specified location Figure 1 Use 10 1 oval head screws to attac...

Страница 46: ...efore beginning installation if the ceiling tile is acoustical remove the tile above the power pole before attaching the power pole to the bracket Figure 2 3 Attach half of the power pole to the brack...

Страница 47: ...power pole together Figure 3 5 Place the ceiling collar around the management column and mount to the cieling with 6 screws Figure 4 drill 2 Robertson long bit tools hardware needed 10 11 16 oval hea...

Страница 48: ...ommunication access below the worksurface level 1 Insert the bottom edge of the trough mounted communication box Figure 1 2 Secure in place with 6 3 8 metal screws Figure 2 NOTES The trough mounted co...

Страница 49: ...r box before installation Figure 1 2 Mount the trough mounted power box to the horizontal wire management trough with 6 5 8 metal screws Figure 2 drill 2 Robertson long bit tools hardware needed NOTES...

Страница 50: ...MARCH 2017 SCENE 2 tayco com 0317...

Отзывы: