1.
Lay the two bottom clips on the
top of the "vinyl clip on tile", then
raise the tile until the two top
springs clip on the bottom of the
upper "clip on tile", (Figure 1).
2.
All top tiles that are glazed will
clip on the welded U brackets on
the top of the panel frame,
(Figure 2).
FIGURE 1
FIGURE 2
INTERMEDIATE TILE
TOP TILE
panel acrylic tile installation
BOTTOM CLIP
TOP SPRING
U BRACKET
MARCH 2017
cosmopolitan 58
Содержание Cosmo
Страница 1: ...Cosmo installation guide March 2017...
Страница 4: ......
Страница 111: ...MARCH 2017 SCENE 2 tayco com 0317...