5
a. The Energy Audit System
..................................................................................... 40
Figure IV-4: Electrical Power Supply
................................................................. 41
b. Electrical Panel
...................................................................................................... 42
TABLE IV – 1: Direct Current Energy Audit
..................................................... 43
c. Engine Control Panel
............................................................................................. 44
2. The Alternating Current System
.............................................................................. 44
a. The AC Electrical Control Panel
.......................................................................... 44
b. Hot Water Heater
.................................................................................................. 44
c. Shore Power Connecting Procedure
..................................................................... 44
d. Disconnect Procedure
............................................................................................ 45
e. Battery Charger Option
........................................................................................ 45
G. The Plumbing Systems
................................................................................................. 45
1. The Fresh Water System
........................................................................................... 45
Figure IV-5: Fresh Water System
........................................................................ 46
2. Bilge Pumps
................................................................................................................ 47
3. Holding Tank
.............................................................................................................. 47
Figure IV-6: Waste Water Plumbing System
.................................................... 48
4. Toilet
............................................................................................................................ 49
Figure IV-7: Partial Plumbing Layout
................................................................. 49
H. The Propane System
..................................................................................................... 50
Figure IV-8: Propane System
............................................................................... 51
CHAPTER V
...................................................................................................................... 52
MAINTENANCE AND MAINTENANCE PROCEDURES
..................................... 52
A. Hull
............................................................................................................................. 52
B. The Deck and Cabin Top
.......................................................................................... 53
C. Interior Woodwork
................................................................................................... 54
D. Spars, Rigging, and Sails
.......................................................................................... 55
1. Spars
........................................................................................................................ 55
2. Standing Rigging
.................................................................................................... 56
3. Sails
......................................................................................................................... 57
4. Running Rigging
.................................................................................................... 58
5. Winches
................................................................................................................... 58
6. Blocks
...................................................................................................................... 59
E. Auxiliary Engines and Related Systems
...................................................................... 59
1. Engine
......................................................................................................................... 59
a. Installation
.............................................................................................................. 59
b. Maintenance
........................................................................................................... 60
2. Drive Train
................................................................................................................. 62
a.
Engine Alignment
................................................................................................... 62
b. Transmission
.......................................................................................................... 63
c. Stuffing Box
............................................................................................................ 63
d. Cutlass Bearing
...................................................................................................... 64
F. Electrical Systems
.......................................................................................................... 64
1. The 12 Volt DC System
.............................................................................................. 64
Содержание VANCOUVER 42
Страница 1: ...1 OPERATIONS AND MAINTENANCE MANUAL TAYANA VANCOUVER 42...
Страница 2: ...2 Tayana V 42 Center Cockpit Sailplan...
Страница 3: ...3 Tayana V 42 Aft Cockpit Interior Layout...
Страница 12: ...12 Figure II 1 Fiberglass Layout Schedule...
Страница 13: ...13 Figure II 2 V 42 Deck and Hull Joint...
Страница 19: ......
Страница 37: ...37 Figure IV 1 Fuel Supply Plumbing...
Страница 38: ...38 Figure IV 2 Fluid Plumbing System...
Страница 39: ...39 Figure IV 3 Center Cockpit Tankage Diagram...
Страница 43: ...43 TABLE IV 1 Direct Current Energy Audit...
Страница 48: ...48 Figure IV 6 Waste Water Plumbing System...
Страница 51: ...51 Figure IV 8 Propane System...