2. Once the frame is installed, remove the plastic tile guide. Install the supply pipework to the isolation
valve and the brass manifolds. The hot water feed should be installed into the left hand manifold and
the cold water feed to the right hand manifold. Ensure the isolation valves are mounted so that they will
be visible and accessible for later stages (Figure 4).
3.With the water inlet supplies installed, install outlet pipework using suitable plumbing fittings. Ensure
that there is enough room to route pipework to the chosen outlet location.
Figure 4
Figure 5
Brass Manifold
Isolation Valve
These fittings are used with flexible hoses to
connect the valve to inlets and outlets
H
H
C
C