![Taurus Vibration Plate VT9 Pro Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/taurus/vibration-plate-vt9-pro/vibration-plate-vt9-pro_assembly-and-operating-instructions-manual_3958349009.webp)
9
1.3
Set-Up Place
⚠
WARNING
+
Do not place the equipment in main corridors or escape routes.
⚠
CAUTION
+
Choose a location in which to place the equipment such that there is enough free space/
clearance to the front, the rear and to the sides of the equipment.
+
The training room should be well ventilated during training and not be exposed to any
draughts.
+
Choose the place in which to set up the equipment such that there is enough free space/
clearance to the front, the rear and to the sides of the equipment.
+
The set-up and mounting surface of the equipment should be flat, loadable and solid.
࣑
ATTENTION
+
The equipment may only be used in one building, in sufficiently tempered and dry rooms
(ambient temperatures between 10°C and 35°C). The equipment should not be used
outdoors or in rooms with high humidity (over 70%) like swimming pools.
+
A floor protective mat/equipment underlay can help to protect high-quality floor coverings
(parquet, laminate, cork, carpets) from dents and sweat and can help to level out slight
unevenness.
Содержание Vibration Plate VT9 Pro
Страница 2: ...2 VT9 PRO...
Страница 4: ...4 VT9 PRO 9 WARRANTY 39 10 CONTACT 41...
Страница 43: ...43...
Страница 44: ...Vibration Plate VT9 Pro...