24
Cross Over Pulley
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Cables
C
I
Screw connections
I
Pulleys and cable routing
I
Slide rails/Guide rods
I
Weights
I
Legend: C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Содержание TF-PTT0212
Страница 2: ...2 Cross Over Pulley...
Страница 4: ...4 Cross Over Pulley...
Страница 13: ...13...
Страница 15: ...15...
Страница 17: ...17...
Страница 19: ...19...
Страница 21: ...2 1 3 4 5 6 7 8 21...
Страница 29: ...72 Socket Head Inner Hexagon Bolt M12 90 2 73 Roller bearing 6201 2Z 4 74 collar 16 12 7 4 75 Nut M12 2 29...
Страница 30: ...Exploded View 10 30 Cross Over Pulley 7 3 Exploded Drawing...
Страница 35: ...35...
Страница 36: ...Taurus Studio Cross Over Pulley Combo A...