1
Main frame
2
2
Ground connection frame
2
3
Frame tube
1
6
Top weight plate bracket
2
10
Guide rod bushing
4
16
Bumper
4
21
10lbs weight plate
28
25
Selector pin
2
26
Guide rod
4
48
Socket Head Inner Hexagon Bolt
M8*40
4
56
Flat washer
Φ16*Φ8.4*1.6
8
60
Nut
M8
4
65
Supporting bracket
4
16
Cross Over Pulley
Step 3:
Assembly of the Guide Rods and Weight Plates
1. Place two supporting brackets (65) and two bumpers (16) on the two sockets of the bottom of
the main frame (1).
2. Insert two guide rods (26) into the sockets of the main frame (1).
3. Carefully slide each of the 14 weight plates (21) onto the guide rods (26) one by one.
4. Slide one top weight plate bracket (6) onto the guide rods (26).
5. Insert the selector pin (25) in one of the weight plates (21).
6. Place one guide rod bushing (10) on each of the guide rods (26).
7. Mount the guide rods (26) onto the upper part of the main frame (1) with two screws (48), four
flat washers (56) and two nuts (60).
8. Repeat the steps 1-7 on the other side.
No. Name
Specification
Qty.
Содержание TF-PTT0212
Страница 2: ...2 Cross Over Pulley...
Страница 4: ...4 Cross Over Pulley...
Страница 13: ...13...
Страница 15: ...15...
Страница 17: ...17...
Страница 19: ...19...
Страница 21: ...2 1 3 4 5 6 7 8 21...
Страница 29: ...72 Socket Head Inner Hexagon Bolt M12 90 2 73 Roller bearing 6201 2Z 4 74 collar 16 12 7 4 75 Nut M12 2 29...
Страница 30: ...Exploded View 10 30 Cross Over Pulley 7 3 Exploded Drawing...
Страница 35: ...35...
Страница 36: ...Taurus Studio Cross Over Pulley Combo A...