32
Chin & Dip
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Cables
C
I
Screw connections
I
Pulleys and cable routing
I
Slide rails/Guide rods
I
Cushions
C
Legend: C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Содержание Dual Pro
Страница 2: ...2 Chin Dip...
Страница 4: ...4 Chin Dip...
Страница 13: ...Glide frame 38 1 Main frame 34 2 1 Sliding guide rod 54 2 13...
Страница 15: ...15...
Страница 17: ...65 65 013 012 46 A B C D 17...
Страница 19: ...19...
Страница 21: ...21...
Страница 23: ...23...
Страница 25: ...25...
Страница 27: ...003 020 60 021 61 48 014 028 002 27...
Страница 29: ...29...
Страница 39: ...39 7 3 Exploded Drawing...
Страница 40: ...17 Exploded View 2 2 2 2 2 118 118 40 Chin Dip...
Страница 45: ...45 Notes...
Страница 46: ...46 Chin Dip Notes...
Страница 47: ...47...
Страница 48: ...Dual Pro Assisted Chin Dip...