No.
Name
Specification Qty.
34-2
Main frame
1
38
Glide frame
1
46
Cable set
1
51
Rod fixing ring
R29.5*21
4
54
Sliding guide rod
Φ25*1078
2
75
Rubber bushing
Φ36*Φ25*21
4
84
Hex socket head cap screw
M6*20
8
96
Spring washer
M6
8
118
Cushion collar
4
22
Chin & Dip
Step 5:
Assembly of the Sliding Guide Rods and Glide Frame
1. Slide the glide frame (38) along with four cushion collars (118) over the sliding guide rods (54).
2. Attach the sliding guide rods (54) to the main frame (34-2) with a total of four rubber bushings
(75), four rod fixing rings (51), eight screws (84) and eight spring washers (96).
3. Screw the cable end (46) into the glide frame (38).
Содержание Dual Pro
Страница 2: ...2 Chin Dip...
Страница 4: ...4 Chin Dip...
Страница 13: ...Glide frame 38 1 Main frame 34 2 1 Sliding guide rod 54 2 13...
Страница 15: ...15...
Страница 17: ...65 65 013 012 46 A B C D 17...
Страница 19: ...19...
Страница 21: ...21...
Страница 23: ...23...
Страница 25: ...25...
Страница 27: ...003 020 60 021 61 48 014 028 002 27...
Страница 29: ...29...
Страница 39: ...39 7 3 Exploded Drawing...
Страница 40: ...17 Exploded View 2 2 2 2 2 118 118 40 Chin Dip...
Страница 45: ...45 Notes...
Страница 46: ...46 Chin Dip Notes...
Страница 47: ...47...
Страница 48: ...Dual Pro Assisted Chin Dip...