Important data
Average income table
NOTE
An average speed of 7 km/h was assumed to prepare the table above.
To know how many hours will be spent to work a certain previously known area, it is
necessary to divide the value of the area by the hourly income.
Example: An area of 100 hectares to be worked with a GNACR of 44 disc blades
(Hourly income = 3.91 hectares).
So: 100 = 25.57
3.91
R: Approximately will be spent 25 (twenty five) hours to work in an area of 100 hectares
with a GNACR of 64 disc blades.
Model
Number of
disc blades
Cutting
width (m)
Hourly income (ha) Daily income (ha)
GNACR
64
6.2
3.91
35.15
72
7.0
4.41
39.69
84
8.2
5.17
46.49
96
9.4
5.92
53.30
108
10.55
6.65
59.82