Tate SmartAire MZ Basic Скачать руководство пользователя страница 26

User Installation Manual 

r1.9-3/11/15

     

 

 

SmartAire

®

 MZ

 

 

 

 

7510 Montevideo Road 

© 2014 Tate Access Floors, Inc.  

Jessup, MD 20794 

 

 

Tel (410)799-4200 

26 of 26 

TROUBLESHOOTING & ALARMS 

 

Troubleshooting 

1.

 

Unit will not power up or 
power is lost unexpectedly. 

Double check all power connections and battery is switched to the “ON” 

position 

2.

 

 Unable to control unit 
through manual interface 

Device is in TCP/IP mode.  Unplug all power connections, and switch the 

battery to the “OFF” position, wait 30 seconds, then plug power back in, 

switch battery to “ON position and press the power button.

 

3.

 

 Yearly on board Battery 
Testing 

Unplug the power connection from the unit and check that the alarm 
sounds for 10 seconds.  Please contact Tate technical services if this is 
not the case within the first five years of operation. 

        Warranty 

Please se

http://tateairflow.com/data-center-products/airflow-

controls/smartaire-mz

 or contact Tate Technical support for warranty terms 

and support.

 

 

Alarm Index 

Note: All alarm conditions will cause SmartAire MZ to react by sounding an alarm, opening all zones fully 
and re-enabling any disabled zones.  Additionally, if configured, an alarm email will processed and sent. 

Alarm 

Description 

Resolution 

Er01: Error 01 

“Er01”

 

Error Flag 1 indicates a power failure 
scenario,  

check PoE supply and all connections 
or Coaxial power connections 

Er02: Error 02 

“Er02”

 

Error Flag 2 indicates a high temperature 
warning, or the measured temperature at 
the sensor is 10°F or more above the set 
point.   

Perform a factory default reset, and 
ensure temperature sensors are 
within 10°F of default set point of 
76°F.   

Er04: Error 04 

“Er04”

 

Error Flag 4 indicates a sensor is 
functioning improperly or has become 
disconnected. 

Check that all connections are 
secure, especially the primary 
temperature tree connector.  If 
alarm persists, Perform a factory 
default reset. 

If any alarm is persistent and the above steps has no effect, please contact Tate Technical support for 
further assistance 

 

Содержание SmartAire MZ Basic

Страница 1: ...allation Manual r1 9 3 11 15 SmartAire MZ 7510 Montevideo Road 2014 Tate Access Floors Inc Jessup MD 20794 Tel 410 799 4200 1 of 26 SmartAire MZ User Installation Guide Please Read and Save These Inst...

Страница 2: ...ttach the Sensors to the Rack Face 8 Step 4 Connect the Sensors to the Tree 9 Step 5 Connect the Tree to the SmartAire MZ 9 Step 6 Turn the Battery On 10 Step 7 Connect the Power to the SmartAire MZ 1...

Страница 3: ...complete All work conducted on units should only be conducted by a trained professional Modifying equipment other than in ways suggested and approved by Tate are not recommended or supported and may d...

Страница 4: ...i recommand ni support et peut endommager l quipement ou causer un pr judice Il est recommand que la batterie est test chaque ann e pour assurer le bon fonctionnement et l exploitation s curit int gr...

Страница 5: ...EE 802 3af Power available at PD 12 95 W Maximum power delivered by PSE 15 40 W Voltage range at PSE 44 0 57 0 V Voltage range at PD 37 0 57 0 V Maximum current 350 mA Maximum cable resistance 20 Cate...

Страница 6: ...ual r1 9 3 11 15 SmartAire MZ 7510 Montevideo Road 2014 Tate Access Floors Inc Jessup MD 20794 Tel 410 799 4200 6 of 26 QUICK INSTALLATION ALUMINUM DIRECTAIRE CABINET FACE QUICK INSTALLATION STEEL DIR...

Страница 7: ...nit and all accessories Prepare zip ties and associated mounting hardware available nearby Prepare the DirectAire or DirectAire Al Panel and Installation Location HANDLE UNIT WITH CARE DO NOT MANUALLY...

Страница 8: ...e corresponding zone of the SmartAire 2 and the rack Zone 1 is the bottom of the rack and Zone 4 is the top of the rack Zip ties can be used to assist in mounting the sensors The sensor face should be...

Страница 9: ...MZ Though the hole in the floor where the SmartAire is to be installed Connect the temperature tree into the SENSOR PORT The Sensor will only connect in one orientation with 1 And 8 on the top of the...

Страница 10: ...ors Inc Jessup MD 20794 Tel 410 799 4200 10 of 26 STEP 6 TURN THE BATTERY ON Switch the Battery backup to the ON Position IT IS NECESSARY TO HAVE THE BATTERY IN THE ON POSITION DURING NORMAL OPERATION...

Страница 11: ...s the preferred option for powering the SmartAire Unit For redundant installation both the PoE and DC Coaxial supply can be provided but this is not necessary Once power is supplied to the unit it wil...

Страница 12: ...en Retighten the screws down to lock them in position A MANUAL PHILIPS HEAD SCREWDRIVER OR A TORQUE LIMITING ELECTRIC SCREW DRIVER IS BEST FOR THIS PORTION OF THE INSTALLATION TO AVOID OVER TORQUING D...

Страница 13: ...display should be mounted in the orientation that it fits on the edge meant to go Towards the rack it is cooling Hand Screw in the four 5mmx 5mm Screws Confirm SmartAire MZ is mounted to DirectAire Al...

Страница 14: ...e left and right parallel stringers to the face of the rack Safely lower the fully extended SmartAire onto the stringer hangers you may need to slightly tilt the hangers inward to connect it perfectly...

Страница 15: ...n top of the preinstalled SmartAire MZ on hangers The DirectAire should rest just above the SmartAire and not apply any force to the SmartAire If this is not the case please contact Tate for assistanc...

Страница 16: ...h mode is currently active press again while the display is flashing to cycle through the mode options Quad zone Mode All four zones operate independently with high speed PID loops calculating current...

Страница 17: ...button C Pressing this button once will convert the interface to Celsius Pressing the button once more will convert the unit back into Fahrenheit DISABLING UNOCCUPIED ZONES 5 Zone Disabling Buttons E...

Страница 18: ...NU AVANC PEUT ALT RER DE MANI RE SIGNICANTE LA FONCTION DO L UNIT SMARTAIRE TATE NE RECOMMANDE PAS DO MODIFIER LES VALEURS DANS LA PROGRAMMATION AVANC E SUR LES UNIT S ACTIVEMENT ENGAG DANS LE REFROID...

Страница 19: ...indow each with a specific IP and MAC Address Each line represents one SmartAire unit Note that SmartAire MZ requires connection to a dynamic DHCP network 6 Double Clicking on the line will force the...

Страница 20: ...c E mail Configuration Interface to configure email alerts for errors The user can configure a custom Gmail account to originate all alerts from SmartAire MZ must have access non firewalled access to...

Страница 21: ...Value 0 0 100 T3_Min Override Minimum Possible Value 0 0 100 T4_Min Override Minimum Possible Value 0 0 100 T1_Max Override Maximum Possible Value 100 0 100 T2_Max Override Maximum Possible Value 100...

Страница 22: ...lso create an audible alarm if any of these conditions have caused failure T2_Fail Zone Failure 0 0 4 T3_Fail Zone Failure 0 0 4 T4_Fail Zone Failure 0 0 4 Board OFF ON 0 off 1 on 0 0 1 This value tur...

Страница 23: ...3 6 1 4 1 43431 1 3 2 0 OctetString SMARTAIREMZ Read_ERORSTATE_T4 0 Read_ERORSTATE_T4 0 1 3 6 1 4 1 43431 1 3 22 0 Integer Pass 0 Read_ERORSTATE_T3 0 Read_ERORSTATE_T3 0 1 3 6 1 4 1 43431 1 3 21 0 Int...

Страница 24: ...tAire Aluminum SA P SmartAire DirectAire Aluminum SA P SmartAire DirectAire Aluminum POE Injector Switch 802 3af 4 Probe Temperature Sensor Ethernet CAT5 Cables 1 Unit Per SmartAire Rack Rack Rack Rac...

Страница 25: ...t cycle This will reset all parameters SNMP settings and TCP IP configurations and restore the unit to its default settings The unit will reboot after a 5 second delay upon completing this action WARN...

Страница 26: ...ire mz or contact Tate Technical support for warranty terms and support Alarm Index Note All alarm conditions will cause SmartAire MZ to react by sounding an alarm opening all zones fully and re enabl...

Отзывы: