4.3 PANEL MOUNT
OPERATOR STATION
WITH DISPLAY
Y4E-RP-D
This operator station allows the monitor to be controlled from a remote location. The installer will need to mount the operator station
and connect the cable to the monitor and power. The enclosure is designed to be mounted on top of a panel control station.
This operator station has an extra power and communication connection point available and can be used as a central location for
terminating wires from the monitor. In this type of installation the monitor cable and the power cable could be installed into this
operator station. On the back of this enclosure are extra strain relief fi ttings.
4.3.1 MOUNTING
Select proper operator location. Panel space required will be 5” x 7-1/4” (127 x 185mm). A depth of 2” (50mm) will be required behind
the panel. Refer to Figure 4.3.1 for cutout dimensions. Allow at least 6” of slack in cable for future repairs.
4-5/8” [135.9mm]
PANEL
CUT-OUT
DIMENSIONS
Ø 7/32" [5.6mm]
(4) PLACES
OR TAP FOR
10-24 UNC THREAD
6-3/8”
[172.0mm]
4-1/2” [128.6mm]
6-3/4”
[192.9mm]
Figure 4.3.1
Panel Mount Operator Station with Display Cutout Dimensions
4.3.2 ELECTRICAL WIRING
See Figure 4.0 for typical connections. The 4-conductor cable from the operator station needs to be connected to power (red & black)
and to the communication link (blue & white) from the monitor. Be sure to tighten all terminal block screws securely.
TIGHTEN DOME NUT
TO 37 IN-LBS (4.2 N-M)
STRIP 1/4" (6mm)
OF INSULATION
REMOVE 6" (150mm) OF
JACKET AND TEFLON TAPE
1/8" (3mm) OF CABLE JACKET
PAST FITTING
NOTE:
CABLE IS GEL FILLED TO PREVENT MOISTURE WICKING
INTO ENCLOSURE. GEL IS NON-HAZARDOUS AND
SHOULD BE WIPED OFF CONDUCTORS WITH A RAG.
Fig 4.3.2
Typical Cable Preparation