
master OM Tartan 3400 2012.doc
Page 69 of 69
All interior doors, drawers, hatch boards, operated and planed down if necessary after rigging
is tensioned. A certain degree of swelling is to be anticipated. (Not warranty, part of
commissioning)
Check that all interior lights are operational.
Check the hoist on all sails and ensure correct halyard lengths as well as freedom of
movement of halyards, etc. Check and adjust operation of reefing system.
After Shakedown Sail:
Re-tension all rigging if necessary.
If excess headstay sag is apparent, adjust furler or tension backstay.
DEALER:_________________________________________________________
OWNER:__________________________________________________________
BOAT MODEL ___________________HULL NUMBER___________________
DATE OF COMMISSIONING_________________________________________
Dealer Signature________________ Date_______
Owner Signature ______________Date_______
Tartan Yachts Signature_____________________ Date __________
Содержание 3400
Страница 15: ...master OM Tartan 3400 2012 doc Page 15 of 69 DECK PLAN WO O D...
Страница 17: ...master OM Tartan 3400 2012 doc Page 17 of 69 ACCOMMODATION PLAN...
Страница 20: ...master OM Tartan 3400 2012 doc Page 20 of 69 INTERIOR LIGHTING PLAN...
Страница 21: ...master OM Tartan 3400 2012 doc Page 21 of 69 BATTERY WIRING SCHEMATIC S G G R ECHO CHARGE...
Страница 23: ...master OM Tartan 3400 2012 doc Page 23 of 69 PROPANE LEAK DETECTOR...
Страница 26: ...master OM Tartan 3400 2012 doc Page 26 of 69 FRESH WATER MANIFOLD TIE WRAP TO CABINET BACK...
Страница 62: ...master OM Tartan 3400 2012 doc Page 62 of 69 Tartan Yachts Commissioning Checklist...
Страница 75: ...Owner Registration tartan reg_ques doc 18 Additional comments THANK YOU FROM TARTAN YACHTS...