background image

Installation Instructions

Targetti USA - A Targetti Group Company - 750-A W. 17th. St. Costa Mesa, CA 92627 - (714) 

513-1991 Email: [email protected] - www.targetti.us - 

02.2020

 - Page 2 of 4

A.

Installers will dig out trenches to prep the sleeve

i.

Put gravel in the trenches for the J-Box

Requirement by UL for

adequate drainage

.

ii.

Safety net covers 

below

 the J-Box and the conduit

 

pipe

 

to warn

 

diggers

what is

 

below

.

B.

Position of the J-Box must be an accessible depth between

 

8.5-11.5"

 

required

for

 

maintenance

.

C.

Once the sleeve is installed, wire the

 fixture's

 power cable through the

J-

Box and connect the power cord to the 

J-Box wiring

Make sure

 

the power

is not live before connecting power cord to line

 

voltage through the J-

Box.

 Once power cord is connected,

 

connect the power cord with the fixture.

Be sure to 

secure 

the

 

connection

 with water tight connectors

 to ensure no

water

 

leakage inside the

 

connector.

Incoming conduit 

system for line 

voltage power

Sleeve for fixture

A

B

C

Gravel for drainage

Fixture's p

ower 

c

able

. Connect 

with line voltage 

power.

 

Outgoing conduit 

system for line 

voltage power

Incoming conduit 

system. Connect to J-

Box with 3/4" NPT 

connector.

Out-going

 conduit 

system. Connect to J-

Box with 3/4" NPT 

connector.

Brass direct 

burial J-Box

Отзывы: