IOM manual Tapflo TE series
22
3.
MAINTENANCE
Maintenance work on electrical installations must be performed by qualified
personnel and only when the power supply has been shut off. Wait five
minutes for capacitor to discharge before opening the pump.
Follow the local
and national safety regulations.
3.1.
Inspections
➢
Periodically check suction and discharge pressures.
➢
Inspect the gear-motor according to the instructions from the motor manufacturer.
➢
Gear oil must be exchanged in accordance with the gear manufacturer instruction manual.
3.2.
When the pump is new or reassembled
If the pump is new or reassembled after maintenance it is important to retighten the
pump housing nuts (pos. 37) after one week of operation.
Make sure to use the right torque
–
see
chapter
5.5
.
3.2.1.
Performance test
When installation is new, a test run of the pump should be conducted. Gauge the capacity
at specific pump speed. This information is useful for checking performance in the future as
wear takes place. You will be able to set schedules for maintenance of the pump and to
select spare parts to be kept on stock.
3.3.
Routine inspection
Frequent observation of the pump operation is recommended to detect problems. A change
in sound of the running pump can be an indication of wearing parts (see chapter
3.5
"Location of faults"
below).
Leaking liquid from the pump and changes of performance may also be detected. Routine
inspections should be conducted frequently. We recommend to conduct a daily check and
keep records of the following:
➢
Leakage of fluid form any connection of the pump
➢
Tightness of all connection parts of the pump and any peripheral equipment
➢
Complete inspection in regular intervals has been done
In case any of the above is not fulfilled, do not start the pump and implement corrective
actions.
Establish a preventive maintenance schedule based on the pump’s service history.
Scheduled maintenance is especially important to prevent spills or leakage due to
diaphragm failure.
Inspect and replace bearing and/or gear-motor shaft extension if failure is suspected.
Inspect and replace set screw bearing, set screw and diaphragm shaft if failure is suspected.