7.
ATEX supplementary manual
IOM manual Tapflo PTL Hose pumps
58
7.20.
Paint thickness
In case of re-painting any of pump part, the thickness of the paint layer must not exceed 2mm.
7.21.
Inspection
Check below points before every pump start or at least once a day when operating pump in
continuous duty:
➢
Pump tightness
➢
If suction port is not obstructed (see section 7.16)
➢
If suction vale is fully opened (see section 7.16)
➢
Pump earthing connection
Содержание PTL Series
Страница 63: ......