background image

EC-TMV & 5EF-TMV
Thermostatic Mixing Valve
Installation Instructions

Models EC-TMV and 5EF-TMV are a direct replacement Thermostatic 

Mixing Valve (TMV) for the Mechanical Mixing Valve used on ChekPoint 

(EC) and Equip (5EF) Electronic Faucets. These TMV’s are tested 

and certifi ed to ASSE 1070.  These TMV’s will control and limit the 

temperature of tempered water to the faucet. They are equipped 

with an adjustable and lockable means to limit the maximum outlet 

temperature with the intention of reducing the risk of scalding.

NOTE: This device is pre-set for approximately 100˚F (38˚C).  This device must be adjusted, verifi ed and locked 

to a specifi c maximum temperature at the time of installation.

TOOLS NEEDED

Adjustable wrench

#2 Phillips Screwdriver

Thermometer

INSTALLATION

1. Turn off  Hot and Cold water supply to the faucet.

2. Disconnect the Hot and Cold fl ex supply hoses at the mechanical mixing valve.

3. Loosen and unscrew the swivel nut connecting the Mechanical Mixing Valve to the fi tting on the Control Module. 

Remove the Mechanical Mixing Valve.

4. Install the outlet side of the TMV (MIX) into the swivel nut connection on the Control Module and tighten.

5. Connect and tighten the Hot and Cold fl ex supply hoses to the corresponding Hot (H) and Cold (C) inlets of the TMV.

6. Turn on Hot and Cold water supply and check for leaks.

ADJUSTMENT

1. Activate the faucet several times until the outlet water temperature stabilizes. Check the temperature with the 

thermometer (Caution - the outlet temperature may be excessively hot).

2. Loosen the Phillips head screw in the TMV knob approximately 6 turns and pull the knob. It should now turn. If not, 

loosen the screw a little more until the knob turns.

Отзывы: