General Instructions
Installation:
Note: Before installing valve flush out all
supply lines.
1. Screw no.
8
into bottom of valve, use
Teflon Tape or pipe joint compound on
threads.
Opening should face towards
front.
4. Connect supply lines to corre-
sponding inlets (cold side is marked
on no.
1
casting).
5. Mount no.
6
at a convenient
location, using no.
3
, no.
4
and no.
5
provided.
6. Attach no.
9
to bottom of no.
8
(B-1450-01 / B-1451-01) or to bottom
of no.
1
(B-1450 LT / B-1451-LT) with
Teflon Tape (
No Loctite
), tighten with
a wrench.
7. Attach no.
10
to end of no.
9
.
8. Turn on water supply and check
for leaks.
anchor
2. Screw no.
7
into opening of no.
8
,
use Teflon Tape (
Do Not Use
Loctite
on threads, as no.
7
may need to be
replaced at a later date.)
3. Mount no.
1
to wall with bolts and
anchors (supplied by others), or other
appropriate means. No.
2
are provided
by T&S Brass
7
1
8
6”
hot side
inlet
cold side
inlet
1
7
6
3
4
5
8”
6
close view of
no.6
i n s t a l l a t i o n
7
1
bolt
close view of
no.1
i n s t a l l a t i o n